
Keynote Speaker Huang Junguang About the Conference Organizing Committee Conference Themes (1) Basic theory and experimental research of pile foundations (2) Design and practice of pile foundation engineering (3) New construction methods and equipment for pile foundation engineering (4) Dynamic response of pile foundations and seismic/vibration reduction technology (5) New materials and new fabrication processes for pile foundation engineering (6) Testing and monitoring of pile foundation engineering (7) Typical cases and accident handling in pile foundation engineering (8) Pile foundation technology in offshore engineering (9) Issues related to technical standards for pile foundation engineering (10) AI-based intelligent transformation and digital-intelligent innovation of pile foundations (11) Other engineering technical issues related to pile foundations Conference Agenda Click now to register and participate A dedicated professional exhibition area will be set up during the conference to showcase cutting-edge research results, innovative engineering technologies, and new equipment, new materials, new instrumentsand more, creating a multi-dimensional academic exchange space for participants.Interested enterprises are welcome to register and participate; for specific details, please contact the registration hotline. Registration hotline contacts: Li Ran, 18612339138 Li Na, 15210863916 Wang Siqi, 15701183916



16th Pile Foundation Conference - Speaker | Chen Xin: Preparation of Industrial Waste Residue-Based Composite Cementitious Materials and Study on Their Soil Stabilization Performance
下一篇16th Pile Foundation Conference - Speaker | Jiang Yiping: Research on Post-Grouting Technology for Driven Steel Pipe Piles Using Hydraulic Resonance-Free Hammer with Static Pressure Post-Grouting Device

2026-09-28 1157 0

2026-09-24 10586 0

2026-09-23 10714 0

2026-09-22 10808 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)