2025Registered Geotechnical EngineerExam Packing Checklist
1,Admission ticket—generally printed about one week before the exam; it is recommended to prepare several copies;
2,ID card—put it in place in advance;
3,Watch—use a traditional wristwatch in the exam room; electronic watches are not allowed

4,Calculator—a calculator without content storage function is required;

5,Signature pen (black)—several;use black,do not use blue;
6,2Bpencils and pencil sharpener、eraser
—use dedicated2Bpencils; sharpen them in advance and prepare at least2pencils; also prepare erasers in advance;
7, Transparent small plastic bag—to hold the first 6 items above;
8,Suitcase (at least 24 inches or larger)
—exam suitcase; books are relatively heavy, so use a slightly larger case, at least24inches or26inches;

9,Exam book stand
—a foldable one is recommended; easy to carry.
10,Exam books
—must bring:50codes and standards,"Soil Mechanics"Third Edition, Engineering Geology Handbook (Fifth Edition), and other reference books;
Other notes:
1. Arrive at the exam room at least 30 minutes early
2. Do not drink large amounts of water before the exam; use the restroom promptly before entering the exam room
3. Pay attention to the weather before the exam; bring an umbrella on rainy days

Vibro Hammer EP550B with Resonance-Free Technology Once Again Empowers CCCC Third Harbor Engineering's Fodu Project
下一篇Expert Committee of China Machinery Industry Federation Holds Special Seminar on the "15th Five-Year Plan Development Outline for the Machinery Industry"

2026-09-28 1157 0

2026-09-24 10586 0

2026-09-23 10714 0

2026-09-22 10808 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)