On September 23, the China (Beijing) International Construction Machinery, Building Material Machinery and Mining Machinery Exhibition (BICES 2025) was held at the Shunyi Hall of the China International Exhibition Center in Beijing. CRCHI (China Railway Construction Heavy Industry Corporation) made a brilliant appearance with its overall tunnel construction solutions, showcasing the company's innovative achievements in building major national equipment and serving major projects.
Zhao Hui, Party Secretary and Chairman of CRCHI, together with Xu Niansha (third from left), Party Secretary and President of the China Machinery Industry Federation, Jia Chengbing (third from right), former Chairman of the Supervisory Board of Central Large Enterprises under the State Council, and Su Zimeng (second from left), President of the China Construction Machinery Association,Wu Peiguo (first from right), Secretary-General of the China Construction Machinery Association,and Zhou Weidong (first from left), President of the Machinery Industry Branch of the China Council for the Promotion of International Trade, posed for a group photo at the CRCHI booth Leaders and guests jointly witnessed the opening of the CRCHI booth Wu Peiguo delivered a speech Zhao Hui delivered a speech Bai Guangzhou, Member of the Party Committee and Deputy General Manager of CRCHI, presided over the opening ceremony




Gathering in Beijing, a splendid presentation
The total exhibition area of this year's exhibition exceeded 150,000 square meters. The CRCHI exhibition lineup, composed of innovative products from its tunnel boring machine, special equipment, and mining equipment business segments, shone across the venue.
BICES 2025 opening ceremony The CRCHI booth drew high foot traffic



Innovative products unveiled one by one
Among the products exhibited by CRCHI were China's largest independently developed diameter shield tunneling machine "Jianghai", the country's first 16-meter-class ultra-large-diameter shield tunneling machine "Jinghua", the world's first pure electric plateau-type fully computerized three-boom rock drilling jumbo, and the disc cutter rock boring machine and other innovative products, demonstrating the company's latest achievements in high-quality development and representing the latest trends in the development of new quality productive forces in the industry.
CRCHI booth

CRCHI's tunnel boring machines include 9 major series and 195 products, mainly used for integrated excavation, boring and support construction of tunnels, roadways, shafts and inclined shafts, with excavation diameters ranging from 0.5 to 23 meters. Its R&D strength, market share of main products, full life-cycle service capability and brand influence are all in a leading position in the industry.
Model of China's largest independently developed diameter shield tunneling machine "Jianghai"(16.64 meters) Model of China's first 16-meter-class ultra-large-diameter shield tunneling machine "Jinghua" Model of "Jianghan Neolithic", China's largest-diameter open-type TBM, for the Yangtze River-to-Han River Water Diversion Project Model of "Tianyue", an open-type TBM for large-slope inclined shafts in pumped storage power stations Model of "Dream", the world's largest-diameter shaft boring machine Model of "Beishan No. 1", the world's first large-slope spiral tunnel boring machine Model of the world's largest-diameter earth pressure/double shield dual-mode boring machine Sand table of boring machines + special equipment







Guided by construction methods and aligned with the development goals of high-end, intelligent and green development, special equipment has achieved iterative upgrading of drill-and-blast tunnel equipment, with intelligent technology leading the industry. CRCHI proposed the world's first overall solution for pure electric tunnel construction equipment, filling a market gap.
Pure electric plateau-type fully computerized three-boom rock drilling jumbo Model of large-diameter horizontal rescue drilling rig

The mining equipment bolter-miner series products continue to maintain a leading position in the industry. Building on the existing product spectrum focused on soft rock roadway excavation, CRCHI has developed new hard rock boring equipment such as the disc cutter rock boring machine and the disc-type rock boring machine, solving the challenges of hard rock and semi-coal rock excavation and leading the innovative development of intelligent equipment.
Mining equipment sand table Model of disc cutter rock boring machine

Diverse formats, stunning experience
At this exhibition, the CRCHI booth not only showcased major national equipment but also presented digital product experiences full of technological content. The video "Journey to the Earth's Core Express: 'Steel Backbone' Deep Earth Roaming" uses AI to envision the future, revealing how the "resident courier" deep within the Earth continues the legend of human stories in deep underground space. The L-screen glasses-free 3D video and quad-screen displays vividly presented the stunning scenes of major national equipment serving major projects.
Innovative displays such as the L-screen glasses-free 3D video and quad-screen let visitors immerse themselves in the experience
As an overall solution provider of high-end equipment manufacturing and services, CRCHI always adheres to innovation-driven development, promotes the high-end, intelligent and green development of construction equipment, provides equipment support for major national engineering projects, and contributes innovative strength to the high-quality development of the industry.
BICES 2025 September 23-26 You are cordially invited to visit the CRCHI booth (Booth No.: E2-619) Experience the charm of major national equipment
BICES 2025 | Green Renewal for New Energy, Winning the Future with Intelligence, 17 Editions of Companionship, XCMG Attends the BICES 2025 Appointment
下一篇BICES 2025 | DAF Equipment Shines at the Beijing Construction Machinery Exhibition

2026-09-28 1137 0

2026-09-24 10491 0

2026-09-23 10629 0

2026-09-22 10708 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)