Recently, the Beijing Engineering Survey and Design Association announced the evaluation results of the 2025 "Beijing Excellent Engineering Survey and Design Achievement Evaluation," and Beijing Urban Construction Survey Institutereceived a total of 18 excellent achievement titles, with the award levels and number reaching a record high. Among them, there are 5 first-class achievements, 11 second-class achievements, and 2 third-class achievements, covering multiple professional technical services such as engineering survey, engineering measurement, safety monitoring, and geotechnical design.These award-winning achievements demonstrate our institute's professional capabilities and hard work, and also reflect the company's continuously improving technical level and service quality in the field of engineering survey and design.
List of Award-Winning Projects / First-Class Achievements / Comprehensive Achievements in Engineering Survey and Geotechnical Engineering 1. Comprehensive Technical Application of Measurement and Monitoring for the South Extension Project of Beijing Subway Changping Line 2. New Technologies, Key Technologies and Their Applications in Survey and Monitoring of Guangzhou Metro Line 7 Phase II Project under Complex Environmental and Geological Conditions Including Crossing the Pearl River, Railways, Fault Zones, and Historic Building Clusters 3. Nanning Rail Transit Line 5 Engineering Survey and Full Life Cycle Risk Management and Control Project 4. Key Technologies and Engineering Applications of Multi-Dimensional Collaborative Survey, Intelligent Monitoring, and Fine Dewatering Design under Complex Geological Conditions for Beijing Subway Line 17 / First-Class Achievements / Special Achievements in Engineering Survey and Design Software 1. "1+4+N" Urban Underground Space Geological Big Data Intelligent Base / Second-Class Achievements / Comprehensive Achievements in Engineering Survey and Geotechnical Engineering 1. Key Technologies and Applications of High-Precision Measurement in Complex Environments for Guangzhou Metro Line 7 Phase II "Multi-Modal Transfer System - Existing Trunk Line Coupling" 2. Third-Party Monitoring for Guiyang Rail Transit Line 3 Project 3. Engineering Measurement for Hefei Rail Transit Line 2 East Extension Project 4. Overall Control Measurement for Tianjin Metro Line 11 Phase I Project (Dongjiangdao Station - Depot) 5. Comprehensive Survey of Strongly Developed Karst Areas for Shenzhen Urban Rail Transit Line 16 Project 6. Engineering Geological Survey for Nanjing Metro Line 7 Project (D7-XK05 Section) 7. Engineering Survey and Key Technologies for Steeply Inclined Coal Mine Goaf Areas in Urumqi Rail Transit Line 1 Project 8. Comprehensive Survey and Key Technologies of Groundwater Control for Beijing Subway Line 19 Phase I 9. Geotechnical Engineering Survey for Section 1 of Fuzhou Rail Transit Line 2 Project 10. Survey and Monitoring Service Project for Shijiazhuang Urban Rail Transit Line 2 Phase I Project 11. Key Technologies and Applications of Comprehensive Survey, Fine Dewatering Design, and Groundwater Environmental Impact Assessment for Beijing Subway Line 16 Phase I Project / Third-Class Achievements / Comprehensive Achievements in Engineering Survey and Geotechnical Engineering 1. 2023 Beijing Subway Bridge and Tunnel Structure Monitoring Project 2. Survey Supervision and Risk Monitoring for Qingdao Metro Line 6 Phase I Project "Beijing Excellent Engineering Survey and Design Achievement Evaluation"aims to commend and reward collectives and individuals who have made outstanding contributions in the field of survey and design in Beijing, and to promote technological innovation and high-quality development in the engineering survey and design industry. Diligent cultivation without pause, advancing toward the new. Beijing Urban Construction Survey Institute will take this award as a new starting point and continueto safeguard urban construction and development, striving to write a new chapter for a better urban life!
Outstanding Works | China Academy of Building Research Supports Complex Construction with Integrated Technologies
下一篇Main Works of Yunnan's First Pumped-Storage Power Station Officially Commence

2026-09-28 1137 0

2026-09-24 10491 0

2026-09-23 10629 0

2026-09-22 10708 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)