The west approach road tunnel of the landside transportation project in the terminal area of Xiamen Xiang'an Airport has been capped. The Zhaiyang access line of Xiamen Metro Line 6 has achieved dual-line breakthrough. The Ocean Innovation Industrial Park (Phase I) project and the Daming Qianxing Port project have started construction... From January to July, the construction of 581 municipal, provincial, and key projects across the city progressed steadily, with effective investment continuing to expand.
Since the beginning of this year, the Municipal Housing and Construction Bureau and the Municipal Key Projects Office, together with departments at all levels, have acted swiftly to deepen and expand the "Three Strivings" action, give full play to the advantages of the "Project Home" platform, strengthen factor guarantees, and actively promote the construction of key projects. The construction of key projects in Xiamen has been accelerated once again, continuously expanding effective investment and empowering and building momentum for the high-quality economic and social development of Xiamen.
Centered on the "4+4+6" modern industrial system, a number of industrial projects have successively broken ground. Recently, the Xingchao Vision (IOI) Digital Art Industrial Park project, the Ocean Innovation Industrial Park (Phase I) project, the Daming Qianxing Port project, the Engineering Machinery Bridge Gearbox Transmission System and Components Expansion Project, the High-tech Parking Industrial Park, and other projects have successively started construction. Among them, the Xingchao Vision (IOI) Digital Art Industrial Park project will build an urban theme park and a new consumer industry complex centered on music, film and television, animation, and games. Once completed, it will leverage industrial agglomeration effects, drive the upgrading and integration of related industries, form a digital art industry chain integrating online and offline, and become a demonstration zone and new benchmark for China's digital art industry.
Urban and rural infrastructure projects are being accelerated. Recently, the Phase II project of Huandeng Road, the comprehensive treatment project of Guanxun Creek in Tong'an New City (the Huandong Sea Area New City section), and the Phase I patrol channel (including checkpoint and fencing) project of the Xiamen New Airport Airport Comprehensive Bonded Zone have successively started construction; the left line of the Zhaiyang access line of Xiamen Metro Line 6 has been completed, achieving dual-line breakthrough, which will meet the needs of Tong'an District residents for faster access to the island and comfortable transportation, and support coordinated cross-district development between the island and off-island areas; the train for Xiamen Metro Line 4 has officially debuted. After Line 4 is completed, the travel time from Xiamen North Station to Xiang'an Airport will be less than 30 minutes; the west approach road tunnel of the landside transportation project in the terminal area of Xiamen Xiang'an Airport has been capped. Once completed and opened to traffic, it will become one of the main channels for various motor vehicles to enter and exit Xiang'an Airport.
22 Key Engineering Construction Projects in Dongcheng District, Xuchang City, Henan Province
下一篇Taizhong Intelligent High-end Engineering Construction Project Accelerates Again

2026-09-28 1157 0

2026-09-24 10586 0

2026-09-23 10714 0

2026-09-22 10808 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)