3m Large-Diameter Staged Drilling: XCMG XR580HD for Underwater Foundation Tamping!

2024-02-23 1061 0人评论
Amid the roar of the XCMG XR580HD rotary drilling rig

Qingshen Hanyang Minjiang Grand Bridge Project

** pile foundation drilling completed

Main pile foundation construction enters the fast lane‍

 

  The Qingshen Hanyang Minjiang Grand Bridge has a total length of 2348.5m. The entire bridge has 323 pile foundations and 50 pile caps in total, all of which are end-bearing piles. The XCMG XR580HD rotary drilling rig is responsible for the construction of large-diameter pile holes. The XCMG rotary drilling rig operates on the trestle bridge; the bridge deck is 12m above the water surface, the water depth is 5m, the construction pile diameter is 3m, and the pile depth is 63m.


The on-site geological structure is complex with obvious stratification

Underwater operations are even more difficult

When performing large-diameter pile hole operations of Φ3m or more

There are problems of difficult coring and difficult salvage of crushed stone

The XCMG XR580HD rotary drilling rig

Staged drilling

Shortens the hole-forming time to 40 hours

Construction efficiency is highly recognized by the customer‍

 
 
  XCMG rotary drilling rigs focus on the development of cutting-edge construction technology and attach importance to innovation in product technology and construction methods. They have extensively participated in projects such as the Chongqing-Xi'an High-Speed Railway and Chongqing East Railway Station, demonstrating excellent quality under tests in various construction environments and helping customers create high-quality benchmark projects!

评论 (0)

TOP