Recently, the Yuchai YCR405 rotary drilling rig participated in the construction of the second-line ship lock project of the Longtoushan Hydropower Station hub in Fengcheng City, Jiangxi Province. The project is located within Fengcheng City under the jurisdiction of Yichun City, Jiangxi Province. Its main construction contents include the main structure of the second-line ship lock, the upstream and downstream approach channels, the water conveyance system, the ship lock management area, the cross-lock bridge and connecting roads, the ramp bridge, and the improvement works of the first-line ship lock. The second-line ship lock of the Longtoushan hub is mainly for power generation, shipping, and urban transportation. It is a large-scale hydropower station hub project that also integrates comprehensive functions such as flood control and irrigation, water supply, tourism, and aquaculture, and is a key node project in the Ganjiang waterway that connects the preceding and following sections. Once the ship lock is completed, it will further leverage the advantages of the Ganjiang waterway's direct trunk-to-branch navigation and river-sea combined transport, build a fast waterway channel for external material exchange in riverside areas, and promote the high-quality development of shipping in the hinterland.

The formation at the construction site of the Yuchai YCR405 rotary drilling rig is complex, including backfill soil, sand and gravel layers, and cobble layers. After drilling to 20 meters, it is mainly red sandstone. The construction pile diameter is 2.2 meters, and the hole depth is 46 meters. After several days of construction performance, the hole-forming quality of the Yuchai YCR405 rotary drilling rig has been recognized by the project department, and the customer also highly praised the equipment's high efficiency, stability, and safety.

Yuchai YCR405 Rotary Drilling Rig:
◆ Equipped with a brand-new China IV engine, it features full combustion and high efficiency. It is a large rotary drilling rig specially developed by Yuchai Rotary Drilling for rock-socketed working conditions.
◆ A newly added fast pressurization function can quickly adjust the position of the power head and improve construction efficiency.
◆ It adopts a hydraulic telescopic crawler chassis specially designed for rotary drilling rigs and is equipped with a large-diameter slewing bearing, ensuring construction stability.
◆ The main beam of the platform uses high-strength steel, making the platform structure more stable and reliable.
◆ The single-row rope main winch structure effectively avoids the "rope biting" problem and greatly extends the service life of the wire rope.
◆ The new-generation electronic control system integrates multiple automatic and intelligent controls such as automatic drilling, automatic soil throwing, slewing self-reset, and multi-gear intelligent control mode of the power head, making operation more convenient.
◆ The drilling diameter can reach 3 meters, the maximum drilling depth can reach 99 meters, and the maximum output torque is 405 kN·m.
◆ It is suitable for the construction of medium and large pile foundation projects such as building construction and bridges.

[Belt and Road Circle of Friends ⑥] XCMG Directional Drilling Rig Safeguards the West-East Gas Pipeline's Energy "New Silk Road"
下一篇Digital Twin + Smart Construction Site Achieves Outstanding Results! Shanghai Jiuzhuo Helps Complete 2,497 Pile Foundations for Zhangjinggao Yangtze River Bridge

2026-09-28 1137 0

2026-09-24 10491 0

2026-09-23 10629 0

2026-09-22 10708 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)