Crawler High-Pressure Jet Grouting Drill Rig
DJE130-V/CP

Product Features
1. Multi-directional luffing mechanism enables drilling multiple rows and angles from a single position, offering strong adaptability;
2. High rotary torque and long drilling stroke effectively improve drilling efficiency;
3. The drill rig features crawler self-propulsion and a 360° rotating undercarriage, allowing convenient and quick relocation;
4. Hydraulic clamp and breakout device at the hole collar reduce tripping time and lower labor intensity;
5. Control handles are rationally arranged for flexible and convenient operation, and a powerful dynamic parameter display and control system provides timely monitoring of engine speed, oil and water temperature, hydraulic system pressure, mud pump pressure, drilling depth, bottom-hole pressure, and other parameters for easy drilling adjustment;
6. The power head speed variation combines a variable displacement hydraulic motor and gearbox, providing a wide and rational speed range, and strong adaptability to formations and processes;
7. Control handles are rationally arranged for flexible and convenient operation, and sufficient digital displays provide timely monitoring of engine speed, oil and water temperature, hydraulic system pressure, and other parameters for easy drilling adjustment.

Product Parameters


Scope of Application
Suitable for jet grouting construction in foundation treatment and reinforcement for railways, highways, bridges, dam foundations, and various industrial and civil buildings; anchor engineering for foundation pit support; when equipped with an air compressor and pneumatic down-the-hole hammer, it can perform simultaneous casing drilling, and in addition to general jet grouting (swing jet, fixed jet) engineering, it can also be used for shallow hole drilling and engineering survey drilling.



High-Quality Belt and Road Cooperation Recognized: Two Zoomlion Projects Selected as Key Outcomes of UN Global Compact
下一篇China Enfi and Jiye Technology Hold Geotechnical Engineering Academic Exchange in Beijing

2025-10-11 12785 0

2025-10-11 12334 0

2025-10-11 12498 0

2025-09-11 12042 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)