DGZ-150S Multi-pipe Horizontal Jet Grouting Drilling Rig
Xitan Equipment: The DGZ-150S multi-pipe horizontal jet grouting drilling rig is widely used in foundation reinforcement engineering, water-seepage cutoff and leak-plugging works, soft ground treatment, and geological disaster mitigation projects for various industrial and civil buildings, including urban underground spaces, subways, highways, bridges, roadbeds, and dam foundations.
The rig can flexibly perform multi-pipe vertical/horizontal construction with drill rod diameters ranging from 89 to 142 mm, and can also be used for general jet grouting construction (including swing jetting and fixed jetting). In addition, it is equipped with a 3-ton boom, effectively reducing the labor intensity of construction personnel.

Performance Features
1. The automatic swing jetting device can be set to any swing angle as required.
2. The lower clamp adopts a floating four-jaw design, ensuring uniform clamping force without damaging the drilling tools.
3. Suitable for construction beneath bridges and inside tunnels, facilitating equipment relocation.
4. Supported by 4-point hydraulic outriggers, enabling step-by-step movement of the hydraulic outriggers.
5. Equipped with a visual interface that allows posture adjustment based on construction parameters and real-time setting of the rotary/lifting speed of the power head.
6. Equipped with a 3-ton boom, effectively reducing the labor intensity of construction personnel.


Technical Parameters

Product Images









51.8 Billion Yuan! Another Expressway in Yunnan Begins Bidding
下一篇Jiyie Technology's Patented Technology Helps Drive Digital Transformation in Mining and Lithium Battery New Energy Industries

2025-10-11 12785 0

2025-10-11 12334 0

2025-10-11 12498 0

2025-09-11 12042 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)