HP-420EV High-Pressure Grouting Pump
High-Pressure, High-Flow Duplex Plunger Construction Pump Station
Shanghai Jiuzhuo's HP-420EV high-pressure grouting pump features an integrated pump station design that meets high-flow construction requirements by combining two high-pressure pumps into a single pump station. After the outputs are merged, the flow rate reaches 420 L/min, satisfying the vast majority of construction requirements.

Performance
1) The equipment is capable of controlling a wide flow range and can set corresponding independent construction plans according to different construction conditions;
2) The equipment operates at low noise, making it most suitable for construction in urban areas;
3) The instruments and switches of the equipment are integrated together, making operation easy;
4) Because the piston and cylinder lubricating oil is supplied via an oil groove filling method, adding oil is very easy and the site can be kept clean;
5) The valves and valve plates can be used in reverse, facilitating operation;
6) Because the suction valve and discharge valve are designed in an L-shaped layout, on-site disassembly, assembly, inspection, and maintenance can be carried out.

Technical Parameters


Main Structure
The HP-420EV high-pressure grouting pump consists of a control panel, delivery components, pressure switch, pressure gauge, safety valve, grout suction flange, fan, lubrication pump, motor, pump body, lubrication fittings, and high-voltage electrical box.


Product Images






Four Testing Methods for Shear Wave Velocity in Marine Geotechnical Engineering
下一篇High-Speed Rail Reaches the Island: XCMG Rotary Drilling Rigs Drive Piles Above the Yangtze River!

2025-10-11 12785 0

2025-10-11 12334 0

2025-10-11 12498 0

2025-09-11 12042 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)