High-pressure grouting pump HP360-EV
The HP360-EV is a custom-built ultra-high-pressure, high-flow pump station from Jiuzhuo Company. With a maximum output pressure of 65 MPa, it can meet most construction requirements, and it adopts a high-performance frequency converter and a newly designed high-pressure pump.
It is mainly used for strengthening and reinforcing soft foundations of new buildings, expressways, high-speed railways, and subways; remediating uneven settlement of buildings; seepage-proof curtains for reservoirs, dams, and underground construction projects; retaining cofferdams; mine plugging; slope anchoring; and other applications.
Maximum flow rate: 360 L/min
Maximum pressure: 65 MPa
Power: 250 kW
Inlet diameter: 100 mm
Outlet diameter: 30 mm

Core configuration
All-new hydraulic end: highly integrated to meet high-flow requirements;
Frequency converter: Inovance frequency converter, with a wide drive frequency range, small size, and stable performance;
Forced-air cooling fan: high air volume, high efficiency, low current, and low noise;
Low noise: enclosed structure, with noise as low as 70 dB;
Mobile IoT: enables remote monitoring and management, suitable for outdoor operations, unrestricted by working conditions and environments, and suitable for multiple industries.
Equipment advantages
High pressure and high flow: maximum flow rate of 360 L/min and maximum pressure of 65 MPa. It offers performance across a wide range of flow rates and allows independent construction plans to be set according to different construction conditions.
Dual-fluid lubrication and efficient sealing: the hydraulic end of the high-pressure pump adopts a dual-fluid lubrication system. By applying the dual lubrication system, the grouting pump improves sealing performance, reduces plunger wear, and increases service efficiency.
New materials and new processes: high-precision equipment processing; all flow-passing parts are cast from high-quality, high-strength, durable, corrosion-resistant special materials using advanced processing techniques.
High power and high efficiency: power can be increased to 250 kW; the product has a compact structure, high efficiency, and is easy to maintain and operate.
Simple operation: equipment instruments and switches are centrally arranged for convenient operation.
Easy cleaning: the piston and cylinder lubricating oil use an oil-groove filling method, making it very easy to add oil and helping keep the site clean.

Technical parameters

Site photos





[Brand Chengkan] Pile Foundation and Foundation Pit Support Works for the Eastern New Town J2-38 Project Undertaken by MCC Chengkan Successfully Completed
下一篇Construction in Full Swing | A Batch of Key Project Milestones "Updated"

2026-09-28 1137 0

2026-09-24 10491 0

2026-09-23 10629 0

2026-09-22 10708 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)