
KR240E
Recently, a Taiheng Foundation KR240E rotary drilling rig was deployed at a housing construction project in Quanzhou, Fujian Province. The site's geological conditions consist mainly of silty sand and silty clay layers with a high groundwater level. The pile holes are 1000 mm in diameter and 35 m deep per hole. The Taiheng Foundation construction team adjusted the mud mix ratio in a timely manner according to the sand content of the silty sand for mud wall protection, and worked with the operator's reasonable control of drill pipe lifting speed to solve the hole collapse problem in the quicksand stratum. Ultimately, the drilling time per hole was shortened to 1 hour and 45 minutes, and the construction task was completed smoothly and efficiently within 20 days, reducing construction costs for the client and earning unanimous praise from the customer.
KR240E High-Performance Fully Hydraulic Rotary Drilling Rig

Performance Features:
● Equipped with a carefully selected, powerful original Cummins engine from the United States, combined with Taixin's core-technology electronic control system and hydraulic system, to fully unleash its working capability;
● The full product series has passed the national GB certification and the EU EN16228 standard certification, with superior dynamic and static stability design to ensure construction safety;
● Taixin's self-manufactured dedicated chassis for rotary drilling rigs perfectly matches the power system with the hydraulic system, adopting the most advanced load-sensing, load-sensitive and proportional-control hydraulic systems in China today, making the hydraulic system more efficient and more energy-saving;
● A classic model that has dominated the market for many years, with stable performance and reliable quality;
● The power head features gear settings and an added rock-drilling mode, reducing operator workload and providing stronger rock-drilling capability;
● The power head features multi-stage shock absorption design for even better damping performance;
● Front-mounted large drum with only two layers of wire rope winding, maximizing wire rope service life;
● Powerful slewing braking performance ensures construction stability and safety under extreme drilling conditions and guarantees pile verticality;
● Equipped with a new-generation ergonomically designed ROPS cab for more comfortable and safer operation.


Beijing 1.2 Billion Housing Construction Tender!
下一篇Project News | Large-Diameter DTH Hammer Meets Construction Challenges and Accelerates Project Delivery

2026-09-28 1137 0

2026-09-24 10491 0

2026-09-23 10629 0

2026-09-22 10708 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)