Wang Junsong
Master of Engineering, Registered Geotechnical Engineer, Class I Registered Structural Engineer, Senior Engineer, currently Director of the Technical Center of Shanghai Changkai Geotechnical Engineering Co., Ltd. His main research areas include geotechnical engineering design, pile foundation optimization consulting, geotechnical engineering accident handling, foundation reinforcement and rectification, and other geotechnical engineering-related fields. He has participated in the compilation of 2 standards, published more than 10 papers, and obtained 7 patents.
Report Title
Application of Super-Large-Tonnage Anchor Static Pressure Piles in Super High-Rise Foundation Reinforcement
Report Content
In super high-rise building foundation reinforcement projects, in order to ensure the safety of the building during use while reducing damage to the foundation slab, large-tonnage anchor static pressure piles need to be adopted. As the tonnage of anchor static pressure piles increases, the corresponding design and construction difficulties also increase. This report introduces two super high-rise engineering projects, both with ultimate bearing capacity values of supplementary piles exceeding 700 tons. They are currently the largest-tonnage anchor static pressure piles in the field of foundation reinforcement in China and can provide reference for similar projects.
Organizing Committee Contact Information
Foundation Engineering Branch of the Architectural Society of China
Zheng Wenhua: 010-64517820
Email: djhy2022@163.com
Address: Institute of Foundation Engineering, China Academy of Building Research Co., Ltd., No. 30 East Beisanhuan Road, Beijing
Foundation Engineering Magazine
Wang Fei: 18612335955
Email: zgjcgc@vip.163.com
Welcome to Join the Exchange


[Speaker] Liang Fayun Invites You to the China Architectural Society Geotechnical Academic Conference (2023)
下一篇[Speaker] Zhang Kuan Invites You to the China Architectural Society Foundation Engineering Academic Conference (2023)

2025-10-23 13791 0

2025-10-20 12644 0

2025-10-20 12987 0

2025-10-13 13395 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)