Construction General Contracting Bidding Announcement for the Comprehensive Transportation Hub Project of Jinan Yaoqiang Airport (Phase III)
I. Industry:Airport
II. Tenderee:Jinan International Airport Construction Co., Ltd., Jinan Rail Transit Group Construction Investment Co., Ltd.
III. Total Project Investment:RMB 12,300 million
IV. Project Overview:
Construction location: Jinan Yaoqiang Airport
Project scale: approximately 390,000 m²
Scope of bidding: construction, completion, and warranty within the scope of the bidding drawings and bill of quantities of this project; see the bidding documents for details.
Estimated contract value of the lot: RMB 4,412 million
V. Planned Construction Period:1,550 calendar days (subject to the commencement order issued by the supervisor)
VI. Obtaining Bidding Documents:
From 09:00 on July 6, 2023 to 17:00 on July 10, 2023, please log in to the Jinan Public Resources Trading Center website (http://jnggzy.jinan.gov.cn/), click "I Want to Participate" and download the ztb version of the prequalification documents.
Announcement Date:July 5, 2023
Source:Jinan Public Resources Trading Center
Link:http://jnggzy.jinan.gov.cn/jnggzyztb/front/showNotice.do?iid=5BD368090C681E2C66DFA5D666927C39&xuanxiang=%E6%8B%9B%E6%A0%87%E5%85%AC%E5%91%8A&isnew=1
Construction General Contracting Bidding Announcement for the T2 Terminal Project of the Phase II Reconstruction and Expansion Airport Project of Jinan Yaoqiang Airport
I. Industry:Airport
II. Tenderee:Jinan International Airport Construction Co., Ltd.
III. Total Project Investment:RMB 43,905,000,000
IV. Project Overview:
Project scale: approximately 600,000 m².
Scope of bidding: construction, completion, and warranty within the scope of the drawings and bill of quantities of this project; see the bidding documents for details.
Estimated contract value of the lot: RMB 7,251 million
V. Obtaining Bidding Documents:
From 09:00 on July 6, 2023 to 17:00 on July 10, 2023, please log in to the Jinan Public Resources Trading Center website (http://jnggzy.jinan.gov.cn/), click "I Want to Participate" and download the ztb version of the prequalification documents.
Announcement Date:July 5, 2023
Source:Jinan Public Resources Trading Center
Link:http://jnggzy.jinan.gov.cn/jnggzyztb/front/showNotice.do?iid=7C7B8D174DD4DC13DA4A39746F9969CB&xuanxiang=%E6%8B%9B%E6%A0%87%E5%85%AC%E5%91%8A&isnew=1
Bidding for Construction Drawing Review of the Newly Built Zhangzhou-Shantou High-Speed Railway (Guangdong Section)
I. Industry:Railway
II. Tenderee:Shenzhen Engineering Construction Command of China Railway Guangzhou Group Co., Ltd.
III. Total Project Investment:Approximately RMB 38.9 billion
IV. Project Overview:
The project starts from Zhangzhou Station in Zhangzhou City, Fujian Province in the north, passes through Chaozhou City, and ends at Shantou Station in Shantou City, Guangdong Province. It connects to the Fuzhou-Xiamen Passenger Dedicated Line under construction in the north and the Shantou-Shanwei Railway under construction in the south, jointly forming a new coastal high-speed railway corridor.
The main line length is 174.680 km, of which the Guangdong section is 48.1 km long, with a design speed of 350 km/h and a bridge-tunnel ratio of 89.50%. There are 5 stations in total, among which Zhangzhou and Zhangpu are existing stations, and Dongshan County, Zhao'an South, and Raoping South are newly built stations.
V. Planned Construction Period:The total construction period is 1,640 calendar days, planned to commence on September 30, 2023 and be completed on March 30, 2028. The service period shall be from the date of contract signing to the completion of project completion acceptance.
VI. Obtaining Bidding Documents:
Bidders are requested to log in to the Guangzhou Public Resources Trading Center website (New Construction Project Trading System) (http://www.gzggzy.cn/) from 09:00 on June 2023 to 16:00 on July 3, 2023 (Beijing time, the same below) to download the electronic bidding documents.
Announcement Date:June 27, 2023
Deadline for Submission of Documents:July 20, 2023
Source:Guangdong Provincial Public Resources Trading Platform
Link:http://www.gzggzy.cn/jyywjsgctlgdzbgg/945470.jhtml
Anluo Expressway: Pile-Slab Soil-Free Subgrade Successfully Completed!
下一篇Yuchai Mini Rotary Drilling Rig Deploys Again to Help Mountain Residents of Hengshan County Solve Drinking Water Challenges

2024-10-08 13423 0

2024-09-30 13142 0

2024-09-20 12919 0

2024-09-13 13091 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel