Bidding Announcement for Unit Price Contracting of Station Building and Related Works in Gansu-Qinghai Section of the Newly Built Xining-Chengdu Railway
I. Industry Involved:Railway
II. Tenderee:Lanxin Railway Gansu-Qinghai Co., Ltd.
III. Total Project Investment:Jointly funded by China Railway Group and Qinghai Province, Gansu Province, and Sichuan Province; funds have been secured
IV. Project Overview:
Construction location: Gansu Province and Qinghai Province.
Construction scale: The Xining-Huangshengguan section (Gansu-Qinghai section) of the newly built Xining-Chengdu Railway has a main line length of 329.9 km. It is a Class I double-track railway, with a bridge-tunnel ratio of 90.8% on the main line. The main line bridges total 59.808 km/92 bridges; the main line tunnels total 236.44 km/51 tunnels (including the 22.38 km Gansu-Qinghai Tunnel, which started construction earlier). The scope includes related works for the connection into the Xining area. Eight station buildings will be newly built in the Gansu-Qinghai section, namely Langmusi (3,999 m²), Luqu (4,000 m²), Hezuo (7,998 m²), Xiahe (3,972 m²), Ganjia (1,998 m²), Tongren (7,992 m²), Jianzha (4,999 m²), and Hualong (4,000 m²).
V. Section Division:
This construction tender is divided into 2 sections. Section numbers: XCZF1 (station building works within Gansu Province) and XCZF2 (station building works within Qinghai Province).

VI. Planned Construction Period:
XCZF1 Section: total construction period of 2,003 calendar days; planned commencement date May 1, 2024; planned completion date October 25, 2029. Among them:
(1) Tangga'ang-Hezuo section (Hezuo Station building): starts May 1, 2024, and is completed December 15, 2027.
(2) Hezuo-Langmusi section (Luqu Station and Langmusi Station buildings): starts May 1, 2024, and is completed October 25, 2028.
(3) Haidongxi-Tangga'ang section (Xiahe Station and Ganjia Station buildings): starts July 1, 2025, and is completed October 25, 2029.
XCZF2 Section: total construction period of 1,577 calendar days; planned commencement date July 1, 2025; planned completion date October 25, 2029.
Haidongxi-Tangga'ang section (Tongren Station, Jianzha Station, and Hualong Station buildings): starts July 1, 2025, and is completed October 25, 2029.
VII. Obtaining of Bidding Documents:
All prospective bidders are requested to log in to the Gansu Provincial Public Resources Trading Network (http://ggzyjy.gansu.gov.cn) from 00:00:00 on July 1, 2023 to 00:00:00 on July 6, 2023 (Beijing time, the same below) to download the electronic prequalification documents free of charge.
Announcement Release Date:June 29, 2023
Deadline for Submission of Documents:9:00 on July 14, 2023
Source:National Public Resources Trading Platform
Link:
http://www.ggzy.gov.cn/information/html/a/620000/0101/202306/30/00622178f9c3c9224b358fce41e24262a215.shtml
Breaking: Heavy Rain in Most Parts of Chongqing Causes Partial Collapse of Wanliang Railway Bridge
下一篇CCTV Focus! "World's No.1 Drill" Takes Part in a Mega Project!

2024-10-08 13423 0

2024-09-30 13142 0

2024-09-20 12919 0

2024-09-13 13091 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)