Risk Elimination and Reinforcement Construction of Tangxi Reservoir in Chaozhou, Guangdong
Curtain grouting Hole diameter: 76mm Depth: 40-70 meters

Machine model





KS800 multifunctional anchor drilling rig (diesel-powered traveling version)
Construction site





Tangxi Reservoir is located in Tangxi Town, Raoping County, Chaozhou City, Guangdong Province, with a total storage capacity of 381 million m³. It is a large (2) type reservoir, with a project grade of Class II, and its main structures are Grade 2.
Construction process



Project: Reservoir reinforcement
Process: Curtain grouting
Hole diameter: 76mm
Depth: 40-70 meters
Working conditions: Soil + weathered rock
Drill pipe diameter: 76mm
Drill pipe length: 2m
Construction results



Construction angle: 90°
Construction efficiency: 40m/h
New Breakthrough: CRCHI's First Domestic Composite Caisson-Type Shaft Boring Machine Successfully Applied
下一篇Repost | CABR Announces 2023 Science and Technology Progress Award Second Prize Winners

2026-09-28 1137 0

2026-09-24 10491 0

2026-09-23 10629 0

2026-09-22 10708 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)