Jiangsu Province Water Conservancy Major Project Bidding Announcement~

2023-06-07 2405 0人评论

Tender Announcement for the Recent Construction Project of the Flood Retention Area around Hongze Lake (within Xuyi County)

I. Industry:Water Conservancy

II. Tenderee:Xuyi County Water Conservancy Key Project Construction Office

III. Total Project Investment:1,141 million yuan

IV. Project Overview:

The main construction content of the Recent Construction Project of the Flood Retention Area around Hongze Lake (within Xuyi County) includes: reinforcement of 56.63 km of lake-facing flood defense embankment, 15.71 km of foundation consolidation by pond filling behind the embankment, 29.74 km of seepage control treatment of the embankment, 52.18 km of water-facing slope revetment and 14.95 km of toe protection, construction of 61.31 km of new crest flood control roads (including 4.65 km of embankment access roads), 18 supporting river-crossing bridges (culverts) on the lake-facing flood defense embankment (11 bridges newly built or demolished and rebuilt, and 7 supporting sluice bridges and culverts), 5 new flood inflow and outflow gates, 2 drainage pumping stations demolished and rebuilt, 1 lake-connecting sluice demolished and rebuilt, and 32 affected structures (including 3 pumping stations and 29 culverts). Environmental protection measures such as ecological restoration of key embankment sections, restoration of nature reserves, and ecological compensation stock enhancement and release, as well as soil and water conservation measures such as topsoil stripping and backfilling.

V. Lot Division:

Construction Lot 6 is tendered, with main construction content including:

(1) 3.83 km of embankment reinforcement;

(2) 3.83 km of water-facing slope revetment;

(3) 2.75 km of seepage control treatment of the embankment;

(4) 3.83 km of flood control roads (excluding embankment access roads);

(5) New construction of the Dalianhu Flood Inflow Gate and demolition and reconstruction of No. 1 Sluice of Dalianhu Village;

(6) Soil and water conservation and construction-period environmental protection works corresponding to the above content. See the tender drawings and bill of quantities for details.

Construction Lot 7 is tendered, with main construction content including:

(1) 3.08 km of embankment reinforcement;

(2) 2.87 km of water-facing slope revetment;

(3) 3.33 km of flood control roads (excluding embankment access roads);

(4) Demolition and reconstruction of Majiahu Pumping Station;

(5) Soil and water conservation and construction-period environmental protection works corresponding to the above content.

See the tender drawings and bill of quantities for details.

VI. Planned Construction Period:48 months

VII. Obtaining of Tender Documents:

After completing the above preparations, within the tender document acquisition period specified in Clause 4.1, use the unit's digital certificate to log in to the Jiangsu Provincial Water Conservancy Project Construction Trading Platform (Jiangsu Provincial Public Resource Trading Network—"One-Window Acceptance, One-Network Service" Comprehensive Service System—Bidding Unit—Water Conservancy Projects) to download the tender documents and their attachments online.

Announcement Release Date:June 5, 2023

Deadline for Submission of Documents:9:15, June 28, 2023

Source:Jiangsu Provincial Public Resource Trading Platform

Link:

http://jsggzy.jszwfw.gov.cn/jyxx/003003/003003001/20230605/6807ab18-71a9-49db-a034-c523155551e3.html

评论 (0)

TOP