Spring returns to the earth · All things renew
Ningxia Qianghang
Cordially invites you to attend
The 12th Deep Foundation Engineering Development Forum
February 24-26, 2023
Flower City Hotel, Kunming, Yunnan
Let us embark on a new journey together
And jointly promote new industry development
Ningxia Qianghang Mechanical Engineering Co., Ltd.
Since its establishment, Ningxia Qianghang Mechanical Engineering Co., Ltd. has adhered to the service tenet of "customer first, quality foremost" and the business philosophy of "unity, trust, gratitude, and mutual benefit." The company survives by engineering quality, seeks development through social reputation, and emphasizes technological improvement and equipment upgrading.
The company has many years of construction experience and has undertaken and completed hundreds of projects since its establishment. It now undertakes various types of foundation construction across the country and abroad. The company's dynamic compaction construction can reach a maximum treatment energy level of 25,000 KN·M.
The company has strong financial and technical strength, with more than 30 professional technical personnel and nearly 100 pieces of various construction equipment. The company has established a sound management system and ensures the smooth implementation of each project through institutionalized management, excellent machinery and equipment, and professional technical personnel, guaranteeing project quality, schedule, safety, and civilized construction.
The company has advanced and complete equipment and well-equipped engineering technical personnel. It mainly undertakes various foundation dynamic compaction treatment projects for roads, power plants, water storage tanks, municipal works, airports, large factories, and other projects; various pile foundation treatment projects such as long spiral cast-in-place piles, static pressure precast piles, gravel compaction piles, deep mixing piles, bored and tamped expanded cement-soil compaction piles, and high-pressure jet grouting piles; various special projects such as building structure reinforcement, special lightning protection, and special lifting; as well as leasing various engineering machinery and equipment to external parties.
Brief introduction to some foundation construction techniques
Dynamic compaction foundation treatment — features a wide range of applications, remarkable reinforcement effects, simple machinery, material savings, and cost savings, among many other advantages; its disadvantages are high construction noise and vibration, making it unsuitable for densely populated urban areas.
Long spiral bored cast-in-place pile (rotary drilled bored cast-in-place pile) — this technique has the advantages of no noise, no vibration, high efficiency and environmental friendliness, and improved single pile bearing capacity; its disadvantage is that a steel reinforcement cage needs to be lowered, which is achieved by post-insertion using special cage-lowering tools.
Compaction pile (lime-soil, plain-soil compaction, etc.) — generally widely used in collapsible loess areas. A cylindrical steel pile pipe is driven into the original foundation, then withdrawn to form a pile hole, after which materials such as plain soil, lime soil, lime-soil, and cement-soil are backfilled and compacted, thereby forming a pile body with an enlarged diameter and together with the original foundation forming a composite foundation.
When the water content of the foundation soil is greater than 24% and the saturation is greater than 65%, the lime-soil or plain-soil compaction pile method should not be used.
Sign up now to participate



Invitation | Xiaojun Fasteners sincerely invites you to the 12th Deep Foundation Engineering Development Forum
下一篇PALFINGER Celebrates Its 444th Anniversary!

2026-09-28 1137 0

2026-09-24 10491 0

2026-09-23 10629 0

2026-09-22 10708 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)