

Spring returns to the earth · All things renew
Fujian Xiaxing
Cordially invites you to attend
The 12th Deep Foundation Engineering Development Forum
February 24-26, 2023
Flower City Hotel, Kunming, Yunnan
Together we embark on a new journey
And promote new industry development
Fujian Xiaxing Heavy Industry Machinery Co., Ltd.
Xiaxing Technology (Zhejiang) Co., Ltd.
Founded in 2012, Fujian Xiaxing Heavy Industry Machinery Co., Ltd. is a pile-driving equipment manufacturer specializing in construction pile foundation equipment, integrating R&D, design, production, sales and leasing. In 2018, the company invested 128 million yuan to build a new plant in Nan'an, Quanzhou, Fujian, and established Xiaxing Technology (Fujian) Co., Ltd., covering an area of more than 50,000 square meters, with a plant area of more than 20,000 square meters.
In 2021, the company invested 500 million yuan to build a new plant in Sanmen County, Taizhou, Zhejiang, covering 166 mu, with a planned plant of 60,000 square meters, a test base of 20,000 square meters, and an office building of 10,000 square meters. Production will begin in 2023, with an annual output value expected to reach 2 billion yuan.
The company currently develops and manufactures pile-driving equipment including the JB series full-hydraulic walking three-point multi-function pile frame, ultra-deep large-diameter long spiral drilling rig, SMW method three-axis and five-axis drilling rig, double-slide double-power-head drilling rig, static drilling rooted pile rig, stiffened composite pile drilling rig, full-rotation full-casing drilling rig, and small TRD method pile rig.


Fujian Xiaxing looks forward to meeting you
A39


Sign up now



Tuli (Wujiang) 2023 Customer Questionnaire Survey
下一篇Invitation | Jing'an Heavy Industry Cordially Invites You to the 12th Deep Foundation Engineering Development Forum

2026-09-03 11654 0

2026-08-18 3975 0
2026-08-10 1003 0

2026-08-10 4721 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)