Construction Case ‖ Xitan MDL-C150 Top Drive Drilling Rig Construction in Jinan, Shandong
Location: Jinan, Shandong
Drilling rig model: MDL-C150
Drilling tool configuration: 89 impact drill pipe with spiral blades
Process type: Foundation pit inclined anchor, ordinary anchor cable
Stratum conditions: 1–15 m backfilled sandy soil layer
Construction angle: 15° Hole diameter: 120 mm Hole depth: 15 m
Total hole time: 25 min (20 min pure drilling + 5 min drill removal)


Construction process steps:
1. Move the drilling rig to the hole position, adjust the angle, and set the outriggers on the ground (try to keep the tracks and outriggers on the ground together).
2. Install the 89 impact drill pipe and impact drill bit, and install the hole opening guide sleeve.
3. Start drilling, rotate in fast gear, feed slowly, and pay attention to pressure and slag discharge conditions (when resistance is encountered, switch to impact drilling and use the spiral blades to discharge slag).
4. When the required depth is reached, remove the drill pipe and stack it neatly.
5. Move the rig to the next hole position.


Summary: For a 120 mm hole diameter and 15 m depth, drilling takes 20 minutes, and drill removal plus relocation takes 10 minutes; about 300 m of hole can be completed in 10 hours.
Beyond Again — SANY SR580 Super-Large Rotary Drilling Rig
下一篇Construction Begins on China's Largest Urban Underground Space Project

2026-10-18 0 0

2026-10-18 0 0

2026-10-17 0 0

2026-09-23 10598 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)