Foremost in Jiangnan, throat of the Central Plains
In Hefei, the "Bàdū"
XCMG rotary drilling rigs are everywhere
Helping local transportation reach in all directions
At the construction site of the Hefei Second Ring Road Expressway, multiple XCMG D-series and E-series rotary drilling rigs are tirelessly drilling through rock and accelerating the schedule, effectively relieving traffic pressure in the old city area and enabling the new transportation network to quickly take on functions such as rapid dispersal of external traffic and orderly conversion between internal and external traffic.

The machines participating in the Second Ring Road construction are all XCMG's flagship rotary drilling rigs, including the XR220D, XR240E and XR280E. With fast rotary head speed, fast main winch lifting speed, and high drilling and soil-shaking efficiency, the shorter hole-forming time truly speeds up the project and effectively reduces operator labor intensity; fuel economy is better, saving usage costs for customers.

Meanwhile, at the Jinling Road project of Hefei Rail Transit Line 8, the XCMG XR240E echoes the XCMG rotary drilling rig legion on the Second Ring Road with its construction efficiency and low fuel consumption. Reliable product quality and efficient hole-forming construction efficiency have earned high recognition from the customer and the project department of China Railway Fourth Bureau.
XCMG Rotary Drilling Rigs' High-Impact Moments in Supporting a Strong Transportation Nation
At present, China has shifted to a stage of high-quality development, placing greater emphasis on structural optimization and overall efficiency improvement. Based on local resource endowments and spatial characteristics, water where suitable, air where suitable, and land where suitable, leveraging comparative advantages, and coordinating the railway, highway, and water transport chapters of a strong transportation nation.
XCMG rotary drilling rigs, with stable and reliable foundation construction, help build key transportation routes across the country, whether in lofty mountains or at torrential rapids.

XCMG rotary drilling rigs seek passage through natural barriers, supporting the Sichuan-Tibet Railway construction

On the Hangzhou-Shaoxing-Ningbo Expressway, costing 400 million yuan per kilometer, XCMG rotary drilling rigs lay a solid foundation

XCMG rotary drilling rigs accelerate the Huangmaohai Bridge construction, speeding up connectivity in the Guangdong-Hong Kong-Macao Greater Bay Area

XCMG XR550D rotary drilling rig under construction at the Xijiang Grand Bridge of the Nansha Port Railway
A strong transportation nation begins with construction. XCMG is committed to building products with advantages in efficiency, intelligence, safety, economy, environmental protection and advanced performance, to support the national transportation network's infrastructure construction!
Zhengzhou Tongbai Road Underpass Tunnel beneath Longhai Road Officially Opens to Traffic
下一篇Comprehensive "Health Check" Drives Improvement, Product Line Expansion Opens Markets — Sunward Successfully Passes Re-certification Audit of Its Safety Management System

2026-09-28 1137 0

2026-09-24 10491 0

2026-09-23 10629 0

2026-09-22 10708 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)