Hebei: Jin-Shi and Shi-Heng Expressways Expected to Start Construction This Year

2018-01-08 832 0人评论
Recently, the Shijiazhuang Municipal Party Committee and Municipal Government issued the "Implementation Opinions on Carrying out the Action of Tackling Key Problems and Improving Quality in Provincial Capital City Construction and Management", proposing that in the next three years, through vigorously carrying out nine special actions including expanding development space, improving urban appearance, improving living conditions, optimizing the provincial capital's ecology, rectifying urban and rural environments, improving carrying capacity, refining urban management, building a transportation hub, and accelerating county town construction, with a focus on implementing 32 tasks, including accelerating rail transit construction to achieve full-line operation of the main urban area and Zhengding County (Zhengding New Area) by 2020; and building the Shijiazhuang International Exhibition Center, etc.
The "Opinions" point out that efforts will be made to build Shijiazhuang into a modern provincial capital and economically strong city with high industrial level, high urban quality, high degree of civilization, high happiness index, strong economic strength, strong innovation drive, strong reform vitality, and strong driving capacity.
By 2020, the pilot area of Zhengding New Area will take initial shape.
The "Opinions" propose that Shijiazhuang will expand development space, accelerate the revision of the new round of overall urban planning, and strive for early approval and implementation.
At the same time, Zhengding New Area will be taken as the main battlefield for urban construction and development, promoting the construction of Zhengding New Area with faster speed, higher efficiency, and better quality. Full efforts will be made to build the pilot area. According to the principle of "early results in concentrated areas, rapid progress in project construction, and initial display of the new area's image", the focus will be on building a 4-square-kilometer pilot area south of Zhouhan River, north of Heyang Road, east of Yuanboyuan Street, and west of Xincheng Street. By the end of 2018, all roads will be open to traffic, water, electricity, gas, heating, and communications will be fully equipped, and the Shijiazhuang International Exhibition Center, Municipal Library, Municipal Planning Exhibition Hall, and Municipal Youth Palace will all be put into use; in 2020, commercial complexes such as the Yayu Sheraton Five-Star Hotel will be completed and put into use, and the pilot area of the new area will take initial shape.
By 2020, Metro Line 1 will achieve full-line operation.
Accelerate rail transit construction, strive to put the Zhengding section of Metro Line 1 into trial operation in 2019, and achieve full-line operation of the main urban area and Zhengding County (Zhengding New Area) by 2020. Accelerate road traffic construction, start the preliminary work of the Xinyuan Expressway sinking project, and complete the north extension of Xincheng Avenue and the north extension of Taihang Street. Accelerate comprehensive utility tunnel construction. In 2018, fully complete the construction and operation of 15 comprehensive utility tunnels including the east extension of Longxing Road, totaling 30.86 kilometers, establish and improve relevant systems for the operation, maintenance, and management of underground comprehensive utility tunnels, and by 2020, all types of pipelines will be incorporated into the tunnels.
Shijiazhuang International Exhibition Center to start trial operation in April.
Accelerate the construction of the Shijiazhuang International Exhibition Center, ensure trial operation in April 2018, completion and use in May 2018, and actively bid for a number of international and national exhibitions, conferences, and other activities in 2018. Accelerate the construction of the vocational education park. Four schools including the Municipal Transportation School will enroll students and be put into use in September, and five schools including the Municipal Urban Construction School will start construction in the second half of 2018 and be completed and put into use in September 2019. Actively promote the construction of the university park and medical service facilities, strive to start full-scale construction of the new campus of Hebei GEO University in 2018, start construction of Hebei Zhongyu Traditional Chinese Medicine Hospital in the second half of 2018, and promote the construction of the Zhengding New Area Hospital of the Second Hospital of Hebei Medical University and the overall relocation of Zhengding County People's Hospital.
Renovate the old passenger station and long-distance bus station areas.
Accelerate the construction of the Central Business District. Start the construction of the Central Business District with Yuhua Road in the south, Heping Road in the north, Zhanqian Street, Gongli Street, and Cheliangchang Qianjie in the west, and Xinshengli Street in the east as the core, upgrade and transform the Cheliangchang area, build Jiefang Square, renovate the old passenger station and long-distance bus station areas, accelerate the transformation and upgrading of the Ziqiang Road Financial Innovation Development Zone, carry out comprehensive rectification of Wanlimiao and Nansantiao markets, and create landmark blocks that blend urban memory with modern industry and highlight the characteristics of the provincial capital.
Promote the construction of the business district of the East Square of the New Passenger Station. Improve road traffic facilities, build an industrial cluster focusing on high-end commerce, business offices, and creative research and development, and initially form a new city名片 by 2020.
Build the Zhongshan Road commercial bustling avenue.
Build the Jiefang Street (Xinshengli Street) Central Landscape Avenue. Implement the construction of Xinshengli Street and the central green axis. In 2018, complete the construction of the bridge crossing Yuhua Road and the west half of the road south of Huaian Road; by the end of 2019, achieve the connection of the 12.2-kilometer east half of the road; in 2020, build the west half and the central green belt to form a north-south central landscape avenue with eight lanes in both directions.
Build the Zhongshan Road commercial bustling avenue. According to the standards of a high-end, atmospheric, bustling, and fashionable landmark boutique street, carry out overall landscape improvement on the approximately 3-kilometer-long block of Zhongshan Road, focusing on the decoration and improvement of road sections, roadside greening, pavement in front of buildings, urban furniture, building facades, and night lighting, to create a street space with prominent commercial atmosphere, rich cultural connotations, and strong life atmosphere. Complete the renovation and improvement work by the end of 2018.
Build 5,000 public rental housing units in 2018.
The provincial capital will accelerate the construction of the housing security system, ensure exceeding the annual target tasks set by the province, including building 5,000 public rental housing units in 2018 and completing 85% of the allocation task of public rental housing built with government investment in 2015.
At the same time, measures such as in-situ resettlement, off-site resettlement, and reconstruction on the original site will be taken to focus on the renovation of D-level dangerous buildings, dilapidated bungalows, tube-shaped apartment buildings, and dilapidated buildings from before the 1970s in the main urban area. Within three years, all shantytown (dilapidated housing) renovation tasks will be started. Comprehensive rectification will be carried out on old residential communities built before 2000 in the main urban area, focusing on the renovation and rectification of infrastructure such as roads, streetlights, greening, and drainage within the communities, and simultaneously carrying out the renovation of facilities such as water supply, power supply, and heating. By 2020, all rectification tasks for old residential communities in the four districts of the main urban area will be completed, and a long-term mechanism will be established to achieve the goal of complete supporting facilities, orderly management, and clean environment in old residential communities.
Promote the Hutuo River ecological restoration project.
The Hutuo River ecological restoration project will be promoted. According to the requirements of "showing results in one year, seeing results in two years, and becoming a masterpiece in three years", accelerate the construction of the Hutuo River ecological restoration project. Before October 1, 2018, the basic river channel improvement project of the Gaocheng section will be basically completed, the beach greening will begin to take shape, and the ecological green corridor and ecological landscape of the urban section will be basically completed. In 2019, the first phase of the Hutuo River ecological restoration project will be completed.
At the same time, in 2018, all counties (cities) will be built into provincial-level garden county towns; by 2020, the county town construction of the whole city will be at the forefront of the province.
Renovation and upgrading along the Ring City Water System, Minxin River, and Taiping River.
In 2018, the provincial capital will start the overall renovation and upgrading along the Ring City Water System, Minxin River, and Taiping River; in 2019, start the upgrading and renovation of Shengli Park and Gaoqian Park, and implement the greening improvement of the total drainage channel; before the end of June 2018, start the construction of the Xiaoqing River Wetland Park; in 2020, complete the renovation of Poshui Park and Tianshan Park, and carry out overall quality improvement of the urban water system to create a recreational space where water and greenery blend.
The "Opinions" also clearly state that in 2018, the provincial capital will basically complete the construction of six parks including Longquan Lake Wetland, Railway Culture Park, Xizhaotong Park, Xihuan Park, Sports Park South Area, and Folk Custom Park, start the construction of Pilu Temple Park and the upgrading and renovation of nine parks including Ping'an Park and Yuxi Park, as well as the Xiaobi Forest Area; in 2019, start the construction of Hutai Park, Southern Park, and Taiping River Park, and implement the renovation and upgrading of four parks including Chang'an Park and Cultural Square; in 2020, start the construction of Yitang Park and Southeast Central Park, and implement the upgrading and renovation of three parks including Minxin Square and Xiqing Park.
By 2020, all municipal roads will achieve rainwater and sewage separation.
The provincial capital will continue to promote the renovation of old water supply networks and the sealing and connection of self-supplied wells. In 2018, complete the construction of 400,000 tons of pre-ozonation facilities for the second phase advanced treatment of the Northwest Water Plant. Start the construction and renovation of 14 main water supply pipelines in the main urban area, and complete all tasks by 2020. Accelerate rainwater and sewage separation renovation. In 2018, complete the renovation tasks of 10 roads; in 2019, complete the renovation tasks of 26 roads; in 2020, complete the renovation tasks of 23 roads, renovate the rainwater and sewage separation discharge pipelines in the main urban area and high-tech zone, and achieve rainwater and sewage separation on all municipal roads. Vigorously promote the construction of sponge cities. In 2018, start the construction of sponge cities in key areas of 30 square kilometers; promote the 100,000 tons/day expansion project of Qiaoxi Sewage Treatment Plant, and complete the main body by 2020.
Renovation of secondary heating networks in old residential communities in the main urban area.
The "Opinions" point out that the project of introducing waste heat from Xibaipo Power Plant into the city will be improved, and the construction of the project of introducing waste heat from Shang'an Power Plant into the city will be started promptly. In 2018, long-term management measures for heating quality and efficiency improvement and clean heating implementation plans will be issued. Before the end of September, the renovation of secondary networks in old residential communities in the main urban area will be completed, the area of clean energy heating will be increased, and the centralized heating and clean energy heating rate will reach 80% by 2018 and 95% by 2020.
Ban all-day street markets within the Second Ring Road by the end of the year.
Next, the provincial capital will demolish various illegally built sheds and pavilions along the streets, clean up and standardize breakfast carts, bicycle repair stalls, etc.; treat street markets by classification, and ban all-day street markets within the Second Ring Road by the end of 2018. Carry out rectification of non-motor vehicle parking, incorporate non-motor vehicle parking into the "three guarantees" management category in front of doors, supervise shared bicycle companies to increase maintenance and operation efforts, and ensure standardized parking of vehicles.
Newly build (expand) 120 compulsory education schools.
In 2018, the provincial capital will issue documents such as the "Measures for the Handover Management of Supporting Educational Facilities for Residential Projects in Shijiazhuang City", accelerate the handover management of supporting educational facilities in newly built residential communities, and ensure that supporting educational facilities are planned, constructed, and delivered for use simultaneously with the first phase of residential construction projects. From 2018 to 2020, 120 compulsory education schools and 50 kindergartens will be newly built (expanded) in eight districts and one county, and the overall renovation project of Shijiazhuang No. 2 Middle School, the overall renovation project of Shijiazhuang No. 5 Middle School, and the overall relocation and reconstruction project of Shijiazhuang No. 15 Middle School will be completed.
Jin-Shi Expressway and Shi-Heng Expressway to start construction this year.
The provincial capital will aim to achieve a "1.5-hour traffic circle" connecting Beijing, Tianjin, and surrounding provincial capital cities, a "1-hour traffic circle" connecting the counties under its jurisdiction, and a "half-hour traffic circle" connecting cluster areas (counties), and accelerate the construction of the urban transportation system. Among them, accelerate the preliminary work of the Beijing-Shijiazhuang Intercity Railway, and strive to start construction of the Baoding-Shijiazhuang section of the Beijing-Shijiazhuang Intercity Railway in 2020.
Improve the expressway network system. Accelerate the construction of the South Ring Expressway and Taihang Mountain Expressway, and strive to complete and open to traffic by the end of 2018; accelerate the construction of the Jin-Shi Expressway and Shi-Heng Expressway, strive to start construction in 2018 and complete and open to traffic by the end of 2020; actively promote the urbanization renovation of expressways within the Ring Expressway.
Accelerate the construction of ring roads. Focus on implementing the S339 and S337 projects, strive to complete preliminary procedures and start construction by the end of 2018; start the preliminary work of the urbanization renovation of National Highway 307 (Jingxing-Jinzhou), and create a demonstration road that runs through the east and west of the city and integrates transportation, tourism, and display.
Complete the construction of 90 kilometers of bus lanes this year.
Accelerate rail transit construction. In 2018, strive to achieve "tunnel breakthrough" for the second phase of Line 1 and the north section of the first phase of Line 3, and strive for trial operation in 2019; in 2020, the first phase of Line 2 will be put into trial operation. Actively plan and start construction of new rail transit lines, strive to obtain national approval for the construction plan of 105 kilometers of Lines 4, 5, and 6 in 2018, and start construction as soon as possible.
In 2018, 90 kilometers of bus lanes will be completed, and a 100-kilometer bus lane network in the urban area will be built to improve bus driving speed and service level; by the end of 2020, 127 electronic bus stop signs will be built at 97 points on two main streets, Yuhua Road and Zhonghua Street. In 2018, complete the research on the bicycle expressway demonstration project, build a demonstration section of more than 5 kilometers by the end of 2020, and accelerate the construction of a bicycle-friendly city.

评论 (0)

TOP