Want to know where to find the best rock drill? Choose Shandong Hengwang rock drills — good quality, low price, and unavailable anywhere else!
I. YT28 Air-Leg Rock Drill Scope of Application
The YT28 air-leg rock drill is a high-efficiency rock drilling machine. It is widely used for drilling blast holes in rock roadway excavation and various rock drilling operations, and is an important tool in rock engineering such as mining, railway, transportation, and water conservancy construction.
II. YT28 Air-Leg Rock Drill Features
Structural features: The machine adopts a bowl-shaped air distribution valve, featuring a reasonable structure and flexible starting. It also offers advantages such as light weight, fast drilling speed, low air consumption, low vibration, convenient operation, low failure rate, long part life, and good economic benefits.
III. YT28 Air-Leg Rock Drill Main Parameters
Model YT28
Machine weight 28 kg
Overall length 661 mm
Operating air pressure 0.63 MPa
Cylinder inner diameter 80 mm
Air pipe inner diameter 25 mm
Water pipe inner diameter 13 mm
Drilling diameter 34-42 mm
Drilling depth 5 m
Shank specification 22*108
IV. YT28 Air-Leg Rock Drill Manufacturer Contact Information
Contact: Wang Li Tel: 0537-2670858 Fax: 0537-2670858
Mobile: 13287223671 QQ: 2881248854
WeChat: 13287223671
Email: 2881248857@qq.com
Shandong Hengwang Heavy Industry Co., Ltd. mainly produces:
1 Engineering rock electric drills KHYD40, KHYD75, KHYD110, KHYD125
2 Mining water exploration drills KHYD40A, KHYD75A, KHYD140, KHYD155, zqsj-90, zqsj-140
3 Tunnel drills ZLJ-250, ZLJ-350, ZLJ-700, ZDY-650, ZDY-800
4 Handheld rock drills, hand-pushed rock drills, impact rock drills
5 Coal electric drills ZM12, ZM15, emulsion drills ZRS50, pneumatic coal drills ZQS30, ZQS40, ZQS45, ZQS50
KY-150 Fully Hydraulic Tunnel Drilling Rig Features: Geological Core Exploration Rig
下一篇D3 Tamper Features: Extra-Small Vibratory Tamper Sold Direct from Manufacturer

2025-10-11 12785 0

2025-10-11 12334 0

2025-10-11 12498 0

2025-09-11 12042 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)