Excavator-Mounted Rock Drill Manufacturer Excavator-Mounted Rock Drill Price Excavator-Mounted Rock Drill Pictures Excavator-Mounted Rock Drill Parameters Factory Direct Supply of Excavator-Mounted Rock Drills Hot-Selling Excavator-Mounted Rock Drill Manufacturer
I. Overview of the Excavator-Mounted Rock Drill
Advantages: The original machine's performance is not altered, enabling interchangeability between the excavator modification and the drilling rig; it can be restored to an excavator in 30 minutes, and efficiency is more than ten times higher than traditional manual pneumatic picks.
Simple operation: The control panel is placed inside the excavator cab; the excavator operator can operate it after simple training, with no need for professional personnel.
Fast speed: A hydraulic rock drill is used to fully improve drilling efficiency. On rock with a hardness of 5.6 degrees, the drilling speed can reach 2-3 meters per minute, 8-10 times that of pneumatic equipment.
Flexibility: The excavator-mounted drilling rig fully combines the advantages of the excavator's convenient mobility and the drilling rig's drilling speed, making it suitable for drilling operations under complex working conditions.
Low cost: The drilling rig of the excavator-mounted drill does not affect the excavator's own functions, and because the excavator's climbing performance and drilling angle adjustment are superior to those of a rock drilling jumbo, it is more flexible. Its price is only 1/10 that of a hydraulic rock drilling jumbo, or even lower than that of a pneumatic rock drilling jumbo.
Suitable for rock below grade 7——shale, sandstone, mudstone, broken strata, backfill layers, concrete, etc.
II. Parameters of the Excavator-Mounted Rock Drill
Drilling diameter: Ф42mm—Ф80mm
Drilling depth: 3 meters per pass / 6 meters per pass
Convertible models: 3 meters per pass models above 8 tons
6 meters per pass models above 13 tons
Drilling time: Shale hole diameter Φ80 depth about 3 meters 40 seconds/hole (sandstone drill bit)
Sandstone hole diameter Φ80 depth about 3 meters 1 minute 30 seconds/hole (sandstone drill bit)
III. Contact Information for the Excavator-Mounted Rock Drill
Contact: Wang Li
WeChat: 13287223671
Tel: 0537-2670858 Mobile: 13287223671 QQ: 2881248854
Construction Begins on Dadeng Island Section of New Airport Expressway; Nangang Sea Bridge Completes 80% of Pile Foundations
下一篇Backhoe Loader / Hydraulic Backhoe Loader: Price per Unit and Pictures

2025-10-11 12785 0

2025-10-11 12334 0

2025-10-11 12498 0

2025-09-11 12042 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)