DTH Drilling Rig Manufacturer DTH Drilling Rig Price DTH Drilling Rig Model DTH Drilling Rig Parameters DTH Drilling Rig Pictures DTH Drilling Rig Factory Supply
|
Technical Parameters of HW910A Open-Air DTH Drilling Rig |
|||
|
Rock drilling hardness |
f=6-20 |
Total weight |
3100kg |
|
Drilling hole diameter |
Φ80-105mm |
Overall dimensions |
4100x2030x2020 |
|
Economic drilling depth |
25m |
Guide frame pitch angle |
Down 118.5°~Up 23.5°, total 142° |
|
Rotation speed |
105r/min |
Guide frame swing angle |
Left 36.5°~Right 11.5°, total 48° |
|
Rotation torque |
980N·m |
Drill boom pitch angle |
---- |
|
Lifting force |
15000N |
Guide frame compensation length |
900mm |
|
Feed method |
Cylinder-chain |
Power |
ZS1125GM (20.2kW 2200r/min) |
|
Feed stroke |
2000mm |
Drill pipe |
Φ60 |
|
Travel speed |
0-2.0Km/h |
Working air pressure |
0.7-1.4 MPa |
|
Gradeability |
30° |
Air consumption |
9-13m³/min |
|
Ground clearance |
254mm |
|
|
|
Improvement Comparison |
|||
|
|
HW910A |
KY100 |
Remarks |
|
Travel components |
Motor + reducer structure |
Steel ball motor direct drive |
Reduces motor pressure and extends motor life |
|
Travel pressure |
11MPa |
14-16Mpa |
|
|
Hydraulic system |
19.2 pump, fast rotation/fast lifting valve group, new flow divider valve |
16 pump |
Increased flow |
|
Rotation motor |
Cycloid motor |
Steel ball motor |
Extends motor life |
|
Rotation speed |
85r/min (diesel engine 1700r/min) |
70r/min (1700) |
Rotation speed increased by 20% |
|
Feed speed |
336mm/s |
280mm/s |
Increased by 20% |
Contact: Wang Li
WeChat:13287223671
Tel: 0537-2670858Mobile: 13287223671QQ: 2881248854
Multi-Functional Crawler DTH Drill Rig — Factory Direct Supply
下一篇Pile Driving Machine Directly Supplied by Manufacturer

2025-10-11 12785 0

2025-10-11 12334 0

2025-10-11 12498 0

2025-09-11 12042 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)