DTH Drill Rig Manufacturer DTH Drill Rig Price DTH Drill Rig Models DTH Drill Rig Parameters DTH Drill Rig Photos DTH Drill Rig Factory Supply
I. Overview of the Multi-Functional Crawler DTH Drill Rig:
The HW400Y-2 crawler hydraulic drill rig adopts new hydraulic technology, featuring low air consumption, high rotary torque and convenient hole repositioning. The rig is compactly structured, and its feed mast has a telescopic compensation function; during drilling the mast is supported on the ground for good stability. Reliable in performance, high in drilling efficiency and adaptable to diverse working conditions, this drill rig is a strong guarantee for construction units to cut costs and raise efficiency. It is mainly used for piling and anchoring, water wells, photovoltaic solar screw piles, and rock drilling for blasting holes in water conservancy, power stations, open-pit mining and road construction.
II. Main Parameters of the Multi-Functional Crawler DTH Drill Rig:
|
Working air pressure (MPa) |
0.7-1.6 (medium pressure) 1.6-2.46 (high pressure) |
|
Air consumption (m3/min) |
10-26 |
|
Drilling diameter (DTH hammer) (mm) |
90-300mm |
|
Drilling depth (m) |
20-100 |
|
Single feed stroke (mm) |
2000 |
|
Drill pipe diameter (mm) |
76/89 |
|
Adaptable rock hardness |
F=6-20 |
|
Drilling diameter (auger) (mm) |
Max. 400mm |
|
Mast pitch angle (°) |
100 total up and down |
|
Mast swing angle (°) |
40 total left and right |
|
Drilling depth (m) |
0-30 |
|
Auger drill pipe diameter (mm) |
130-400 |
|
Rotation speed< P> |
0-70 |
|
Main unit power (kW) |
56 |
|
Climbing angle (°) |
35 |
|
Travel speed (km/h) |
0-2.5 |
|
Overall weight (kg) |
4360 |
|
Overall dimensions (mm) L*W*H |
4460*1950*2460 |
III. Contact Information for the Multi-Functional Crawler DTH Drill Rig:
Contact: Wang Li
WeChat:13287223671
Tel: 0537-2670858Mobile: 13287223671QQ: 2881248854
Hydraulic Guardrail Pile Driver - Factory Direct Supply - Guardrail Pile Driver Price
下一篇Factory Direct Supply of Open-Air DTH Drilling Rigs

2025-10-11 12785 0

2025-10-11 12334 0

2025-10-11 12498 0

2025-09-11 12042 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)