244km Railway Project: China Railway First, Third, Fourth, Seventh, Twelfth, Sixteenth, Nineteenth Bureau, Beijing Engineering Bureau, Electrification Bureau… Bid Winning Announcement!

2017-06-07 1539 0人评论
Announcement of Bid Winning Candidates for the Newly Built Jingbian-Shenmu Coal Transport Railway Project
Project Overview
I. Project Scale:
The Jing-Shen Railway starts from the Huolihai Rabbit Line Station of the Hongning Railway in the north and connects to the Jingbian North Station of the Menghua Railway in the south. A new Xiaojihan North to Xiaojihan connecting line (including the section from Lihua Factory North to Lihua Factory West) will be built, connecting to the Yanzezhe Station of the Baoxi Railway via the existing Xiaojihan and Yuheng Railway (Phase I), and connecting to the Baichenghe Line Station of the Jing-Shen Railway via the Yuheng Railway (Phase II under construction); a new Mengjiawan to Hongshixia connecting line will be built to connect to the Hongshixia Station of the Baoxi Railway; a new Nalingaotu to Dabaodang connecting line will be built to connect to the Qingshui Industrial Park; a new Huanghaoje to Yangqiaopan collection and transport station branch line will be built to connect to the Jingbian Energy and Chemical Industry Park.
The main line of Phase I has a total length of 243.958 km, of which the single-track section from Huolihai Rabbit Line Station (inclusive) to Huanghaoje (inclusive) is 227.334 km, and the double-track section from Huanghaoje (exclusive) to Jingbian North (inclusive) is 16.624 km; the total length of connecting lines is 42.027 km, including the Xiaojihan North to Xiaojihan connecting line (including the section from Lihua Factory North to Lihua Factory West) with a total length of 11.727 km, and the Mengjiawan to Hongshixia connecting line with a total length of 30.3 km (of which the single-track section from Mengjiawan to Hongshixia is 26.1 km, and the relief line from Liujiamao Line Station to Hongshixia Station is 4.2 km). The entire line has 23 stations and 2 line stations. Among them, there are 16 intermediate stations, 3 junction stations, 3 passing stations, and 1 overtaking station. The total project investment is 15.309 billion yuan, and the designed annual transport capacity is 100 million tons.
II. Planned Construction Period: 3 years
III. Section Division:
The offline engineering construction is divided into 10 sections.
The "Three Electrics" relocation and modification construction is divided into 2 sections:
JSQG-1 Section: DK0+000-- LDK93+709.9 (including the right line), including the reserved Xiaohaotu Station at Nalingaotu Station, the reserved Jinjitan branch line connection project at Mengjiawan Station, and the coal loading line projects at Xiaobaodang, Guojiatan, and Caojiatan. The total length of the line is about 97 km, and this section is within the design scope of China Railway Fourth Survey and Design Institute.
JSQG-2 Section: DK73+000-- D1K215+953.95, including the 11.73 km Xiaojihan North to Hongshiqiao connecting line. The total length of the line is about 155 km, and this section is within the design scope of China Railway Consulting.
The pre-station engineering supervision is divided into 3 sections:
1) Supervision Section 1 (JSZQJL-I): DK0+000~DK73+000, supervising 3 civil engineering sections.
2) Supervision Section 2 (JSZQJL-II): DK73+000~DK164+800, Xiaojihan North to Hongshiqiao connecting line 11.73KM, supervising 4 civil engineering sections.
3) Supervision Section 3 (JSZQJL-III): DK164+800~D1K215+953.95, supervising 3 civil engineering sections.
Offline Engineering Construction Bid Winning Information
JSTJ-01 Section
First Bid Winning Candidate:
China Railway Third Bureau Group Co., Ltd.

Second Bid Winning Candidate:
China Railway Seventh Bureau Group Co., Ltd.

Third Bid Winning Candidate:
China Railway Fourth Bureau Group Co., Ltd.

JSTJ-02 Section
First Bid Winning Candidate:
China Railway Twelfth Bureau Group Co., Ltd.

Second Bid Winning Candidate:
China Railway First Bureau Group Co., Ltd.

Third Bid Winning Candidate:
China Railway Third Bureau Group Co., Ltd.

JSTJ-03 Section
First Bid Winning Candidate:
China Railway Beijing Engineering Bureau Group Co., Ltd.

Second Bid Winning Candidate:
China Railway Nineteenth Bureau Group Co., Ltd.

Third Bid Winning Candidate:
China Railway Third Bureau Group Co., Ltd.

JSTJ-05 Section
First Bid Winning Candidate:
China Railway Fourth Bureau Group Co., Ltd.

Second Bid Winning Candidate:
China Railway First Bureau Group Co., Ltd.

Third Bid Winning Candidate:
China Railway Fourteenth Bureau Group Co., Ltd.

JSTJ-06 Section
First Bid Winning Candidate:
China Railway Seventh Bureau Group Co., Ltd.

Second Bid Winning Candidate:
China Railway Nineteenth Bureau Group Co., Ltd.

Third Bid Winning Candidate:
China Railway Beijing Engineering Bureau Group Co., Ltd.

JSTJ-07 Section
First Bid Winning Candidate:
China Railway Beijing Engineering Bureau Group Co., Ltd.

Second Bid Winning Candidate:
China Railway Sixteenth Bureau Group Co., Ltd.

Third Bid Winning Candidate:
Xinjiang Beixin Road & Bridge Group Co., Ltd.

JSTJ-08 Section
First Bid Winning Candidate:
China Railway Fourth Bureau Group Co., Ltd.

Second Bid Winning Candidate:
China Railway Twelfth Bureau Group Co., Ltd.

Third Bid Winning Candidate:
China Railway Fourteenth Bureau Group Co., Ltd.

JSTJ-09 Section
First Bid Winning Candidate:
China Railway Sixteenth Bureau Group Co., Ltd.

Second Bid Winning Candidate:
China Railway Seventeenth Bureau Group Co., Ltd.

Third Bid Winning Candidate:
China Railway Eighteenth Bureau Group Co., Ltd.

JSTJ-10 Section
First Bid Winning Candidate:
China Railway First Bureau Group Co., Ltd.

Second Bid Winning Candidate:
China Railway Twelfth Bureau Group Co., Ltd.

Third Bid Winning Candidate:
CCCC First Highway Engineering Co., Ltd.

JSTJ-11 Section
First Bid Winning Candidate:
China Railway Nineteenth Bureau Group Co., Ltd.

Second Bid Winning Candidate:
China Railway Second Bureau Engineering Co., Ltd.

Third Bid Winning Candidate:
China State Construction Engineering Corporation Ltd.
 
"Three Electrics" Relocation and Modification Construction Bid Winning Information
JSQG-1 Section
First Bid Winning Candidate:
China Railway Electrification Bureau Group Co., Ltd.

Second Bid Winning Candidate:
China Railway Twenty-Fourth Bureau Group Co., Ltd.

Third Bid Winning Candidate:
China Railway Twentieth Bureau Group Co., Ltd.

JSQG-2 Section
First Bid Winning Candidate:
China Railway Electrification Bureau Group Co., Ltd.

Second Bid Winning Candidate:
China Railway Twenty-Fourth Bureau Group Co., Ltd.

Third Bid Winning Candidate:
China Railway Twentieth Bureau Group Co., Ltd.
 
Pre-station Engineering Supervision Bid Winning Information
Supervision Section 1
First Bid Winning Candidate:
China Railway Huatie Engineering Design Group Co., Ltd.

Second Bid Winning Candidate:
Gansu Tieke Construction Engineering Consulting Co., Ltd.

Third Bid Winning Candidate:
Beijing Fangda Engineering Management Co., Ltd.

Supervision Section 2
First Bid Winning Candidate:
China Railway Huatie Engineering Design Group Co., Ltd.

Second Bid Winning Candidate:
China Railway Fourth Survey and Design Institute (Hubei) Engineering Supervision Consulting Co., Ltd.

Third Bid Winning Candidate:
Gansu Tieke Construction Engineering Consulting Co., Ltd.

Supervision Section 3
First Bid Winning Candidate:
Zhengzhou Zhongyuan Railway Construction Engineering Supervision Co., Ltd.

Second Bid Winning Candidate:
China Railway Fourth Survey and Design Institute (Hubei) Engineering Supervision Consulting Co., Ltd.

Third Bid Winning Candidate:
Beijing Tieyan Construction Supervision Co., Ltd.
Public Notice Period: June 6, 2017 to June 8, 2017

评论 (0)

TOP