Symptoms of excavator engine hard starting:
① The starter speed is normal and drives the engine to turn normally, but the engine is hard to start;
② The engine is hard to start in a cold state;
③ The engine is hard to start in a hot state
Causes of excavator engine hard starting:
① The fuel filter is dirty and clogged;
② Fuel pump failure, causing the excavator engine hard starting fault;
③ Incorrect fuel injection timing angle;
④ The starting preheating device circuit is open, the preheating device does not work, the oil temperature is too low, and the intake air temperature is too low;
⑤ The intake air filter is clogged, causing the excavator engine hard starting fault;
⑥ The fuel line leaks oil, the fuel circuit changeover switch on the fuel tank is in the wrong position, and there is no fuel supply;
⑦ Starter failure;
⑧ Improper starting operation;
⑨ Incorrect fuel grade, causing the excavator engine hard starting fault;
⑩ Engine failure;
Troubleshooting methods for excavator engine hard starting:
① Check and replace the fuel filter;
② Check and replace the air filter element;
③ Check and adjust the fuel pump;
④ Check the oil pipes and oil circuit to ensure smooth fuel supply;
⑤ Adjust the fuel injection timing angle;
⑥ Check the cold start preheating device so that it can work reliably during cold starting; cold start preheating consumes a large amount of battery energy, so the battery power supply must be ensured when using the cold start preheating device;
⑦ Check the starter and starting control device to ensure reliable operation;
⑧ Start the engine correctly;
⑨ Fill with fuel of a qualified grade; if necessary, drain the water from the fuel in the lower part of the fuel tank;
⑩ Repair the engine;
6,000 Chinese Construction Workers to Build Homes in Israel, Avoiding Sensitive Areas
下一篇Key Technology Research on Construction and Maintenance Management of Beipanjiang Bridge Reaches International Leading Level

2024-09-29 13335 0

2024-09-20 13336 0

2024-09-20 13180 0

2024-09-19 12457 0

Lize City Air Terminal Underground Main Structure Nearing Completion: Maximum Transfer Walk Under 4 Minutes After Operation

Anti-seepage Curtain for Main Lock Pit of CSCEC Port Shenqiu Double-Line Lock Project Completed on Schedule

All Pile Foundations Completed on Quanzhou Baiqi Channel

Hainan Upgrades Housing and Municipal Infrastructure

First Foundation Concrete Pour Successfully Completed for Zambia Kafue West–Muzuma 330kV Transmission Line EPC Project
Hot News
评论 (0)