Improving the urban road network and alleviating traffic congestion are key components of Luoyang's major livelihood projects announced this year. Yesterday, the reporter learned from the Municipal Housing and Construction Commission that in 2016, the Luobei urban area plans to implement 65 municipal infrastructure projects with a total estimated investment of 8.77 billion yuan, including 4.31 billion yuan planned for 2016, involving 21 new projects, 43 continuing projects, and 1 preliminary project.
This year, after the implementation of new projects such as the east section reconstruction and expansion of National Highway 310, the Zhujiang Road underpass tunnel beneath the Luo River, and the major repair of Wuhan Road, the daily travel conditions of residents will be greatly improved, the urban road network will be perfected, traffic congestion will be alleviated, and it will play a driving role in accelerating the construction of a modern infrastructure system in Luoyang.
The 65 municipal infrastructure projects implemented in the city this year
(I) 21 New Projects
10 Road Projects
● Wangcheng Avenue bus stop renovation project, completed
● Zhongzhou East Road bus stop renovation project, completed
● Qiming South Road major repair project, from Qiming Road flower bed in the north to Zhongzhou Road in the south, 1.5 km long, with simultaneous implementation of overhead wire undergrounding
● Hanggong Road middle section project, from Guohua Road in the west to Dingding North Road in the east, total length 2.1 km
● Penglai Road (Phase II) construction project, from Wuhan Road in the west to Zhengzhou Road in the east, 0.7 km long
● Wuhan Road major repair project, from Jianshe Road in the north to Sunshi Road in the south, 3.2 km long
● Lianmeng Road major repair project, from Nanchang Road in the east to Wuhan Road in the west, 3.3 km long
● Weiyi Road Hanggong Road westward section, implementing the section from the existing National Highway 310 to Xin'an County park, 3.05 km long
● West Ring Road Luobei section construction project, from the existing National Highway 310 in the north to Zhongzhou West Road in the south, total length 2.6 km, to be built as an urban expressway
● National Highway 310 east section reconstruction and expansion project, from Dingding North Road in the west to Anju Road in the east, total length 8.5 km
3 Bridge Projects
● Zhujiang Road underpass tunnel beneath the Luo River project, starting in Luobei urban area on the north side of Zhainan First Road, passing under Binhe North Road, the Luo River, and Binhe South Road, then emerging on the west side of the artificial lake, with the underpass section beneath the Luo River 1.3 km long
● Zhengzhou-Lushi Expressway Jiudu West Road connector and West Ring Road interchange project, from Jiudu Road in the north to the expressway connector in the west, utilizing the existing bridge of the Jiudu West Road expressway connector to design an underpass ramp, and designing a ramp on the north side of Jiudu West Road to connect with the West Ring Road, while building 3 new ramp bridges crossing the West Ring Road, 1 new parallel bridge where the West Ring Road crosses Zhangluoping Gully, and 1 ramp underpass box culvert
● 5 pedestrian overpass projects, site selection completed, namely: Dennis overpass on the north side of the intersection of Nanchang Road and Lichun Road, overpass in front of China Airborne Missile Academy on Jiefang Road, overpass in front of AVIC Optoelectronics on Kaixuan Road, and 2 overpasses in front of the Orthopedic Hospital
6 Supporting Projects for Affordable Housing
Qianjing South Road, Kewen Road, Jingliu Road, Miaonan Road, Zhenxing Road, Limin East Street
2 Urban Public Service Projects
● 5 substation cable trenches
● Chan River sewage pipeline construction project, starting at National Highway 310, building sewage pipelines on both sides of the Chan River channel from north to south, intercepting sewage outlets along the line to prevent direct discharge of sewage into the Chan River
(II) 43 Continuing Projects
11 Municipal Road Continuing Projects at the City Level
● Yanhuang Road, Wangcheng Bridge auxiliary road, Sunxin Road reconstruction, Jingu Yuan North Road, Jingqi Road, North Ring Road Phase I, North Ring Road Phase II, Zhengzhou South Road, East Ring Road Luobei section, Hanggong Road eastward extension, Jiudu Road east extension
31 Supporting Projects for Affordable Housing
● Zhoushan North Road in Jianxi District;
● Jingyi Road, Daobei West Road, Longxiang East Road, Jianhe East Road North Section, Jianhe East Road Middle Section, Jianhe East Road South Section, Daonan Road, Hanggong Road, Planned Road in Xigong District;
● Songshan North Road, Daobei Third Road, Daobei Fourth Road, Daobei Fifth Road, Daobei Sixth Road, North Ring Auxiliary Road, Jingba Road, Jingjiu Road, Jianhua East Road, Longquan Xigou Road in Laocheng District;
● Limin South Street, Hualin Road, Shijia Street, Qiming East Road, Mangshan Road, Zhenxing South Road, Xiaofang Road, Planned Road on the west side of Chan River, Planned Road on the south side of Chan River, Limin East Street, Wanshou Street in Chanhe Hui District
Xinjie Bridge across the Luo River bridge construction project
● Including north bank approach, north approach bridge, two ground auxiliary roads, nine-span continuous arch landscape main bridge across the Luo River, and south bank Binhe South Road approach, etc. The main line is an urban arterial road with two-way six lanes. Currently, the project has completed an investment of 220 million yuan, 100% of the arch bases, 97% of the bridge pile foundations. It is planned to complete the construction of the nine-span continuous arch rings before the 2016 flood season, complete the main bridge construction before the end of this year, and open to traffic before the 2017 Peony Culture Festival
(III) 1 Preliminary Project
Continue to advance the Nanchang Road and Binhe North Road interchange project
评论 (0)