Classification of Building Relocation by Foundation Treatment Method at Beijing Pengcheng Taihua

2016-03-30 522 0人评论
Classification of Building Relocation by Foundation Treatment Method at Beijing Pengcheng Taihua 57267363
 
1. Cut-off method: The cut-off method refers to cutting the foundation at a certain horizontal level, moving the upper structure away, constructing a new foundation at the new position, and then connecting the upper structure to the new foundation.
2. Integral method: The integral method refers to moving the main building structure together with the foundation. This situation usually applies when the foundation is shallow; it is not suitable for deep foundations (such as pile foundations). Whether the cut-off method or the integral method is adopted, the main considerations are project cost and construction convenience.

评论 (0)

TOP