What to Pay Attention to When Pouring Concrete in Winter Construction

2013-12-17 515 0人评论
       Prepare the winter concrete construction organization plan and preparatory work: 1. Maintain, protect, and inspect the water supply and drainage pipes and mechanical equipment of the mixing station; insulate and enclose the water storage tank and prepare for the installation of high-power electric heating tubes.

  2. Prepare in advance the raw materials for winter construction concrete (such as cement, coarse and fine aggregates, admixtures, mixing water, etc.).

  3. Organize technical briefings for winter construction and training on fire prevention, frost prevention, and safety knowledge to improve construction personnel's understanding of winter construction.

  4. Assign dedicated personnel to closely monitor weather changes every day, regularly observe ambient air temperature, the temperature of various materials, and the temperatures of concrete discharge and placement into forms.