Company News | Shanghai Zhenzhong Contributes to the Successful Opening of CRCC's Magufuli Bridge in Tanzania!

2025-09-08 4844 0人评论

From Pile Foundation to Thoroughfare 



From

Foundation to

Success


The starting point of every thoroughfare

is deeply buried in solid earth

It begins with silent pile foundations one after another

Carrying craftsmanship, growing upward through time


Africa's longest low-tower cable-stayed bridge — the Magufuli Bridge



2020

is the depth of Shanghai Zhenzhong's craftsmanship and dedication

and also the span connecting the future

2025




PERFECT INTEGRATION 

OF TECHNOLOGY & ART

Part.01

Perfect Integration of Technology and Art




Magufuli Bridge

4.66kilometers total length

520meters main bridge length

120km/h design speed

123main girder segments




The main bridge towers of the Magufuli Bridge have a unique shape, like open arms spanning the lake; the bridge's color scheme is ingeniously integrated with theTanzanian national flag'sgreen、blue、golden yellowthree colors, which not only highlights the majestic grandeur of modern bridge engineering, but also symbolizes Tanzania's open posture toward prosperity and development.




PERFORMANCE IN ACTION

Part.02

Equipment Shows Its Prowess



Our company's multipleresonance-free variable-frequencyvibratory hammerssince being delivered for use in 2020, have been used on the Magufuli Bridgeconstruction workandplayed an indispensable role.




The equipment adoptsresonance-free variable-frequencytechnology, featuringefficient pile driving and extraction、simple operation、strong adaptabilityand other advantages: not onlygreatly reducing startup energy consumptionbut alsoflexibly adjusting vibration frequency according to different geological conditionsgreatly enhancing adaptability to complex environments. Our company's proprietaryrapid start-stoptechnology effectivelyavoids resonance effects、ensuringconstruction safety and efficiencyperfectly coping with Tanzania's complex construction environment.





Resonance-free variable-frequency vibratory hammer at bridge construction site


Resonance-free variable-frequency vibratory hammerMain performance highlights:

High efficiency and energy saving:Variable-frequency technology significantlyreduces energy consumptionlow power supply configuration requirements,green and energy-saving。

Intelligent and precise:Adjustable frequencyflexiblyadaptto different geologyconstructionprecise and efficient。

Safe and stable:Fast and smooth shutdowneffectivelyavoiding resonance、ensuring construction safety。

Reliable and durable:Vibration-resistant variable-frequency motor with long service life、environmentally friendly and reliable。




GREEN CONSTRUCTION

Part.03

Green Construction




Shanghai Zhenzhong'sresonance-free variable-frequency vibratory hammerwith itsresonance-free, high-efficiency and energy-savingenvironmental characteristics, significantly reduced interference with the waters of Lake Victoria and the surrounding ecology, protecting with practical action the "Mother Lake" on which the Tanzanian people depend for survival, demonstrating the responsibility and commitment of Chinese equipment manufacturing to coexist with nature.






ZHENZHONG MISSION

Part.04

Zhenzhong Mission


The Magufuli Bridge is a landmark project of the "Belt and Road" initiative; its completion and opening to traffic mark a key link promoting cross-border cooperation in the East African Community, and theresonance-free variable-frequency vibratory hammeronce again proved our company's equipmentreliability and advanced nature in complex construction environments.



Our company is also honored to participate in this historic project, contributing the strength of Chinese manufacturing to the "Belt and Road" construction with our equipment and technology.


评论 (0)

TOP