On December 30, 2023, the reporter learned from the Anhui Provincial Department of Transport that the construction bidding announcement for the civil works of the reconstruction and expansion project of the section from Bengbu Interchange to Lukou Hub of the G3 Beijing-Taipei Expressway has been released. The project falls under the highway industry, with a planned construction period of 22 months and a total investment of 8.86 billion yuan.

Project Overview
The reconstruction and expansion project of the section from Bengbu Interchange to Lukou Hub of the G3 Beijing-Taipei Expressway is a key construction project during Anhui Province's 14th Five-Year Plan period. It is of great significance for building the "Anhui 123 Travel Traffic Circle," enhancing the capacity of inter-provincial corridors, and advancing the integrated development of the Yangtze River Delta.

This project is located within Hefei City, Bengbu City, and Chuzhou City, with a total route length of 107.02 km. The entire line will be reconstructed and expanded to an eight-lane expressway standard. The main technical standards are as follows:
Design speed: 120 km/h; integral subgrade width: 42 m; separated subgrade width: 2×20.75 m; design flood frequency: extra-large bridges: large, medium, and small bridges and culverts: 1/100; newly built and demolished-and-rebuilt bridges adopt Highway Class I loading, and when existing bridges are utilized, their load-bearing capacity shall meet Highway Class I loading; the pavement adopts asphalt concrete pavement with a standard axle load of BZZ-100.
Main scope of works: reconstruction and expansion of 1,867 m/4 large bridges, 2,181 m/67 medium and small bridges, and 4,231 m/40 branch road overpasses; reconstruction and expansion of 6 interchanges at Bengbu, Xiquanjie, Yongkang, Jiuzi, Shuangmiao, and Lukou, utilization of 1 interchange at Jiuzi, reservation of Tuanjie Interchange, and addition of 2 interchanges at Wudian and Jiangji; reconstruction and expansion of 1 service area at Wuxu and addition of 1 service area at Caomiao. Keywords: engineering construction, engineering news, engineering construction information

Obtaining and Submission of Bidding Documents
Potential bidders must log in to the Anhui (regional) public resource trading electronic service system to consult the bidding documents. The bidding documents are available from December 27, 2023 to January 16, 2024. The bid opening time for this project is 10:00 on January 16, 2024, and the bid opening location is Bid Opening Room No. 5, 2nd Floor, Anhui Hefei Public Resource Trading Center.
Xinjiang Commences Construction on a Large Batch of Water Conservancy Projects, Completing Investment of 30.12 Billion Yuan
下一篇2024! **National Railway Network Construction and Planning Map
2026-10-30 15 0
2026-10-29 11 0

2024-10-08 13424 0

2024-09-30 13143 0
评论 (0)