Hefei West Station, Anhui - Micro-pile Construction
500MM hole diameter, 10 meters deep, red sandstone

Preface
Hefei West Station is located in Shushan District, Hefei City, Anhui Province. It is one of the three major passenger stations of the Hefei railway hub and a major passenger station on the Beijing-Hong Kong (Taiwan) High-Speed Railway corridor. The station has a total scale of 8 platforms and 18 tracks, with a total building area of 80,000 square meters. Once completed, it will connect lines including the Hefei-Anqing section of the Beijing-Hong Kong High-Speed Railway, the Shangqiu-Hefei section of the Beijing-Hong Kong High-Speed Railway, the Hefei-Hangzhou High-Speed Railway, and the Anhui section of the Hefei-Xinyang High-Speed Railway.
Machine model





Kongshan KS800 multifunctional anchor drilling rig
Construction site





Qianshan Road, Shushan District, Hefei City, Anhui Province
Construction process






Construction process: micro-pile
Drill pipe: 102MM
Drill bit: 500MM
Impactor: 12-inch
Hole diameter: 500MM
Depth: 10M
Geology: red sandstone
Sullair 1070SRH air compressors: 2 units
Construction results



Construction angle: 90°
Construction results: 8m/h
Seminar and Exchange Promote Improvement: Zhaodi Holds Seminar on Innovation and Application of Fully Prefabricated Buildings
下一篇27 Hours, 2640 Meters: XCMG Sets New Record for Directional Drilling Crossing in Nigeria!

2026-10-29 13 0

2026-09-28 1142 0

2026-09-24 10494 0

2026-09-23 10633 0
评论 (0)