According to CCTV News, affected by rainfall, at around 8:50 on August 3, on the Harbin-Mudanjiang section of the G10 Suifenhe-Manzhouli Expressway (this section is also referred to as the Harbin-Mudanjiang Expressway for short), near the 253 km–254 km section in the direction from Mudanjiang to Harbin, part of the roadbed of a bridge was washed away by floodwaters and collapsed, causing traffic disruption.

Through the real-time monitoring footage from the Command Center of the Traffic Management Bureau of the Heilongjiang Provincial Public Security Department, it was seen that the section near 253 km–254 km of the Harbin-Mudanjiang section of the G10 Suifenhe-Manzhouli Expressway in the direction from Mudanjiang to Harbin has been placed under traffic control; the bridge has partially collapsed, and the river channel below the road surface has a rapid current. According to passing members of the public, less than 5 minutes after the incident (around 8:53 on August 3), a vehicle accidentally fell into the collapsed area. A total of two small vehicles, one black and one white, fell in, and the specific casualty situation at the scene is unknown.

Also according to The Beijing News, a bridge near Tongzigou at the 254 km mark of the Harbin-Mudanjiang Expressway in Heilongjiang partially collapsed. A dashcam in a passing car captured footage of a white car falling beneath the bridge; afterward, the driver of the white car was rescued by the combined efforts of drivers and passengers at the scene.

According to Xinhua Net, reporters learned from Heilongjiang Provincial Transportation Investment Group Co., Ltd. that at around 8:50 on August 3, affected by heavy rain, the approach slab at the Ant River bridge head at the 253 km mark of the Harbin-Mudanjiang Expressway in the direction from Mudanjiang to Harbin fell off due to mountain flood scouring, and vehicles fell.
Also according to the Heilongjiang Provincial Public Security Department Highway Traffic Management Bureau, at present, at the 235 km mark of the Harbin-Mudanjiang Expressway in the direction toward Mudanjiang, the emergency lane and driving lane have suffered pavement collapse; at the 303 km mark there is water overtopping; at the 315 km mark there is a risk of bridge collapse; and there is relatively heavy water accumulation at multiple other sections.
In addition, regarding this matter, the official account of the Heilongjiang Highway Traffic Police released a video stating that at around 8:50 a.m. on August 3, a bridge on the section near Tongzigou at the 254 km mark of the Harbin-Mudanjiang Expressway partially collapsed. At present, traffic police and highway administration departments are carrying out emergency handling at the scene, and two-way emergency control measures have been implemented on this section. Vehicles passing through this section are requested to slow down and follow traffic police instructions. Vehicles heading to Harbin are requested to exit from the Hengdaohezi toll station, and vehicles heading to Mudanjiang are requested to exit from the Yabuli toll station.

This shocking accident has brought us the following lessons:
1. The importance of safety awareness and prevention awareness:The occurrence of the accident reminds us that safety awareness and prevention awareness are very important. When constructing and maintaining infrastructure such as bridges, various natural conditions and possible influencing factors should be fully considered, and corresponding safety measures should be taken to reduce the occurrence of accidents.
2. Quality supervision of infrastructure construction and maintenance:This bridge collapse accident may be related to the impact of rainy weather on the bridge structure. Therefore, quality supervision of infrastructure construction and maintenance is very important. Relevant departments should strengthen supervision of project quality to ensure the safe and stable operation of infrastructure.
3. Rapid emergency response and rescue capabilities:After the accident, the local traffic management department quickly took measures to implement control, and police and rescue personnel also quickly arrived at the scene to carry out emergency rescue. This shows the importance of rapid emergency response and rescue capabilities; effective organization and coordination of rescue work can minimize the losses caused by accidents.
4. Strengthen traffic safety management:To ensure the traffic safety of subsequent vehicles, the authorities took necessary measures to control lanes and closed the lanes leading to the accident scene. This reminds us that in traffic management, attention to traffic safety is crucial, and it is necessary to strengthen the maintenance and management of road traffic and take timely measures to ensure smooth and safe traffic.
5. Investigation and prevention of collapse accidents:Relevant departments are investigating and assessing the cause of the bridge collapse. This shows that timely accident investigation and assessment and the adoption of corresponding repair and safety measures are important and can prevent the recurrence of similar accidents.
By drawing on these lessons, we can further strengthen safety awareness, improve infrastructure construction and maintenance work, enhance emergency response and rescue capabilities, strengthen traffic safety management, and continuously carry out accident investigation and prevention work to ensure the safety of people's lives and property.
Zhang Hongru Invites You to the China Architectural Society Foundation Engineering Academic Conference (2023)
下一篇155 meters, the deepest in China! First pile of Pier No. 3 of Chizhou Yangtze River Highway-Railway Bridge successfully drilled

2026-10-14 0 0

2026-09-28 39 0

2026-09-22 10755 0

2026-09-18 11026 0
评论 (0)