News screenshots show that the Taiyuan metropolitan area rail transit network consists of 13 lines totaling 575 kilometers, with 271 stations.
The lines planned for near-term implementation and connection to Wusu Airport are: Line 1, Line 3, and Line R1.

Key points!
The Shanxi News Network report still included the plan for Taiyu Station; the plan to extend Taiyuan Metro Line 1 and Line 3 to Yuci is still being advanced; from Metro Lines 1 and 3, it is clear that Taiyuan and Yuci are equally valued as a dual-center development in the short term.
Line R1 is an upgraded version of the original Line R3. It starts at Wusu Airport and connects to Metro Lines 1 and 3, then turns to the vicinity of Fendong Street to connect with Metro Line 2, and is built straight south, ultimately connecting Taigu, Pingyao, and Yaocheng Airport.

评论 (0)