1. The soil on the foundation pit walls is unstable and is affected by groundwater.
2. The earthwork volume for sloped excavation is too large and uneconomical.
3. It is easily restricted by the construction site or adjacent buildings, so sloped excavation cannot be used.
评论 (0)