a. Long interruptions should be avoided during pile driving.
b. For the construction of extra-long steel piles, heavy hammers should be used, and the hammering stress must be strictly controlled.
c. For large-diameter steel piles, if it is difficult to drive them to the bearing stratum, the pile toe can be reinforced or other comprehensive construction methods can be adopted.
评论 (0)