Pile Foundation Project of the S305 Provincial Road Overpass Crossing the Beijing-Kowloon Railway Completed
2015-01-075590人评论
On January 5, the pile foundation project of the Fuyang S305 Provincial Road overpass crossing the Beijing-Kowloon Railway, constructed by the Fourth Engineering Company of China Railway No.10 Engineering Group, was completed.
The project is located in the section from Shizhuang to Lizhuang in Yingzhou District. It starts at the planned Zhuyuan Road intersection in the north, with the main road running south and crossing over the Beijing-Kowloon Railway. The bridge has a total length of 1,293 meters. At the same time, the auxiliary road passes under the Beijing-Kowloon Railway in the form of a frame bridge, and conditions are reserved for a full interchange with the planned Xinhan Road. The highway is a Class I highway that also serves as an urban arterial road, with a design speed of 60 km/h for the main road and 40 km/h for the auxiliary road. By adding a branch line to connect with the Fuxin Expressway, the route has a total length of 6.4 kilometers. Construction is scheduled to be completed in 2016.
This project is an important connecting line between Fuyang City and the Fuyang-Xincai Expressway and has been included in the city's "Twelfth Five-Year" comprehensive transportation development plan. It is of positive significance for expanding Fuyang's urban framework, building major corridors, and creating a major road network.
评论 (0)