Tysim Small Rotary Drilling Rig Shines in Waterproof Wall Construction
Recently, a customer in Jingjiang purchased a Tysim KR80 rotary drilling rig for pile foundation construction of small buildings such as civil and industrial buildings. The customer's project foundation has been treated with cement grouting, and the foundation is relatively hard. It is necessary to carry out the construction of waterproof wall secant piles, with a general pile depth of 15 meters and a pile diameter of 0.8 meters. The original site of the project was a chemical plant with pollutant leakage. According to the rectification requirements of the environmental protection department, a seepage-proof wall is built by the river to prevent some pollutants from leaking from the original site and to lock the pollution source. The small drilling rig has high construction efficiency, working continuously for ten hours, and can form a pile in twenty minutes. The efficient construction effect has made the customer very satisfied, saying that it has obvious advantages in small pile hole construction: fast movement, small footprint, low fuel consumption, easy maintenance, and very high hole-forming quality, meeting the local construction requirements. The drilling rig itself is easy to operate, highly reliable, and has high pile-forming efficiency.
2016-06-16